In case of emergency, an electric utility may begin necessary work without complying with ss. PSC 112.06 and 112.07. The utility shall do all of the following:
Wis. Admin. Code Public Service Commission PSC 112.075
In case of emergency, an electric utility may begin necessary work without complying with ss. PSC 112.06 and 112.07. The utility shall do all of the following:
Wis. Admin. Code Public Service Commission PSC 112.075