A sidewalk is required on at least one side of the street when project scope includes full depth reconstruction or new construction on an arterial that:
Unless a deviation is granted under WAC 479-14-200.
Wash. Admin. Code § 479-14-223
A sidewalk is required on at least one side of the street when project scope includes full depth reconstruction or new construction on an arterial that:
Unless a deviation is granted under WAC 479-14-200.
Wash. Admin. Code § 479-14-223