Current through Register Vol. 54, No. 44, November 2, 2024
Section 457.8 - Certification of classification and capacity(a) Bids will be accepted only from contractors who have a current prequalification certificate in accordance with this chapter. In those cases when either the bidder does not have adequate current prequalification capacity rating, as required by subsection (b) or the types of work on which the contractor has been classified and eligible to bid do not constitute over 50% of the total bid price, the bid will be excluded and rejected. Items noted in the proposal as specialty items may be excluded.(b) So that the Department may have the necessary information to pass upon the ability of a contractor to satisfactorily complete a project, contractors shall submit with their proposal a certification of capacity to do the particular work. If the contractor desires credit for subcontracted items of work on the particular project, the contractor shall include the names of the subcontractors in the proposal. Subcontractors so named shall have the necessary capacity and classification. In making this certification, the contractor shall certify that the current qualification amount, less amount of all uncompleted work which includes subcontracts except as permitted by § 457.16 (relating to sublettings) the contractor has under contract is sufficient to cover the amount of the proposal. The making of a false certification shall constitute cause for rejection of the proposal of the contractor.(c) The Department may reject a bid at any time prior to the actual awarding of a contract if, in its judgment, the best interest of the Commonwealth will be promoted thereby, or if there have been developments subsequent to prequalification, which, in the opinion of the Department would affect the responsibility of the contractor. In addition to the right of the Department to reject, a bid may be rejected if it appears that after the contractor was prequalified, the contractor was declared in default on a project, or prequalification was suspended or withdrawn by the Department, or a major change occurred in the management of the contractor's firm. Before taking the action, the Department will as soon as possible notify the contractor and give the contractor an opportunity to present additional information to the Department.The provisions of this §457.8 adopted September 21, 1973, effective 9/22/1973, 3 Pa.B. 2133; amended April 13, 1979, effective 4/14/1979, 9 Pa.B. 1308; amended November 28, 1980, effective 11/29/1980, 10 Pa.B. 4470; amended April 11, 1997, effective 7/1/1997, 27 Pa.B. 1798. This section cited in 67 Pa. Code § 457.9 (relating to false certification with bid).