Current through December 10, 2024
For Level 1 Interconnection Review, the EU shall first evaluate the potential for Adverse System Impacts using the following screens, which must be satisfied:
1. For interconnection of a proposed DGF to a Line Section on a Radial Distribution Circuit, the aggregated generation on the Line Section, including the proposed DGF, shall not exceed 15% of the Line Section annual peak load.2. When a proposed DGF is to be interconnected to a single-phase shared Secondary Line, the aggregate generation capacity on the shared Secondary Line, including the proposed DGF, may not exceed 20 kW.3. When a proposed DGF is single-phase and is to be interconnected to a center tap neutral of a 240 volt service, its addition may not create an imbalance between the two sides of the 240 volt service of more than 20% of the nameplate rating of the service transformer.4. Construction of facilities by the EU on its own system is not required to accommodate the DGF.39 Miss. Code. R. 4-I-5-101