Current through November, 2024
Section 11-55-34.08 - Notice of intent(a) Persons seeking coverage under a general permit shall submit a notice of intent, except for the point source discharges from the application of pesticides, if not required (refer to Appendix M).(b) A notice of intent shall: (1) Be submitted on forms provided by the director;(2) Comply with the notice of intent requirements of the respective general permit; and(3) Be accompanied by all pertinent information which the director may require in order to establish effluent limitations or best management practices, including, but not limited to, complete engineering reports, schedule of progress, plans, specifications, maps, measurements, quantitative and qualitative determinations, records, and all related materials.(c) The director may require that all reports, plans, specifications, and other material submitted to the director be prepared by a licensed professional engineer.(d) Material submitted shall be complete and accurate.(e) Any notice of intent form submitted to the director shall be signed in accordance with section 11-55-07(a).(f) All other reports or responses to requests for information required by the director shall be signed in accordance with section 11-55-07(b) .(g) Any change in the written authorization submitted to the director under subsection (f) which occurs after the issuance of a permit shall be reported to the director by submitting a copy of a new written authorization which meets the requirements of subsections (e) and (f).(h) Any person signing a document under subsections (e) and (f) shall make a certification in accordance with 40 CFR § 122.22(d).(i) Each owner or operator who submits a notice of intent to be covered under the general permit provisions or for renewal of general permit coverage shall pay a filing fee of $500. This filing fee shall be submitted with the notice of intent and shall not be refunded nor applied to any subsequent NPDES individual permit application following final action denying coverage under the general permit provisions. (1) When a notice of intent is submitted to the director for a substantial alteration or addition to the treatment works or waste outlet and where a general permit authorization has previously been granted for the treatment works or waste outlet, the owner or operator shall be assessed the fee of $500;(2) A new owner or operator or both of a discharge facility covered by the general permit provisions shall submit a new notice of intent unless the new owner submits a notice of automatic transfer that meets 40 CFR § 122.61(b). The new owner or operator shall be assessed the fee of $500; and (3) Fees shall be made payable to the 'State of Hawaii" in the form of a pre-printed check, cashier's check, money order, or as otherwise specified by the director.(j) A notice of intent shall be submitted to the director at least thirty days before the earlier of: (1) The beginning of any discharge, which is not covered under Appendix C or except for coverage under Appendix M for a declared pest emergency situation where the notice of intent shall be submitted no later than thirty days after beginning the pesticide discharge;(2) The beginning of any construction activity which is covered under Appendix C, unless coverage is required for an emergency-related construction activity where an NOI shall be submitted no later than thirty calendar days after the start of construction activities;(3) The expiration date of the existing general permit; or(4) The expiration date of the existing notice of general permit coverage.(m) A notice of intent shall be submitted to the director for:(1) Any storm water discharge associated with industrial activity from an existing facility that is owned or operated by a municipality with a population of less than 100,000 that is not authorized by a general or individual permit, other than an airport, power-plant, or uncontrolled sanitary landfill; or(2) Any discharge from an existing regulated small municipal separate storm sewer system which is qualified to obtain coverage under the general permit. A small municipal separate storm sewer system, including but not limited to systems operated by federal, state, and local governments, including state departments of transportation, is regulated when it is located in an urbanized area as determined by the latest decennial census by the Bureau of the Census. (If the small municipal separate storm sewer system is not located entirely within an urbanized area, only the portion that is within the urbanized area is regulated.) Small municipal separate storm sewer systems located outside of urbanized areas are designated to submit a notice of intent if the department determines that the storm water discharge results in or has the potential to result in exceedances of water quality standards, including impairment of designated uses, or other significant water quality impacts, including habitat and biological impacts. The notice of intent shall be submitted within thirty days of notice from the department.(o) The submittal date is the date the department receives the notice of intent. The thirty day period includes weekends and holidays. If the director notifies the owner or operator or its duly authorized representative that the notice of intent is incomplete, the thirty day period shall start over upon receipt of the revised notice of intent. The director may waive this thirty day requirement by notifying the owner or operator in writing of a notice of general permit coverage before the thirty days expire. Haw. Code R. § 11-55-34.08
[Eff and comp 10/29/92; am 09/23/96; am and comp 09/22/97; comp 01/06/01; am and comp 11/07/02; comp 08/01/05; am and comp 10/22/07; am and comp JUN 15 2009] (Auth: HRS §§ 342D-4, 342D-5; 33 U.S.C. §§1342, 1370, 1251-1387; 40 CFR §122.28 ) (Imp: HRS §§ 6E-42(a), 342D-2, 342D-4, 342D-5, 342D-50; 33 U.S.C. §§1311, 1342, 1370, 1251-1387; 40 CFR Parts 122; 123; 124; 125; §§122.22, 122.26, 122.28(b) (2) (ii) and (iii), 123.25(a) (11))Am and Comp 10/21/12; Am and Comp 12/6/13; Comp 11/15/14; Comp 7/13/2018