Current through Register 1537, December 20, 2024
Section 10.033 - Permit Modifications(1) A permittee shall provide at least 30 days advance written notice to the Authority before it: (a) pumps or discharges Septage in a Municipality not authorized for pumping or discharge by the permittee in its Septage Discharge Permit;(b) transports Industrial Waste, if the Permittee's Septage Discharge Permit does not authorize the transport of Industrial Waste; and/or(c) takes any other action that alters the information provided in its Septage Discharge Permit application or that would be inconsistent with a term or condition of its permit.(2) The Authority will review the information provided in the written notification and will inform the permittee if the proposed change requires submission of a new permit application. If the Authority requires a new permit application, the permittee shall file a new permit application and obtain a modified permit before taking the action described in the notice. If the Authority does not require a new permit application, the permittee may take the action described in the notice so long as that action does not violate 360 CMR 10.000 or the Person's Septage Discharge Permit.Amended by Mass Register Issue 1399, eff. 9/6/2019.