Current through Register 1537, December 20, 2024
Section 10.032 - Terms and Conditions of Septage Discharge PermitsA Septage Discharge Permit issued under 360 CMR 10.000 may require that the permittee:
(1) Limit the rate, time, characteristic, origin, and discharge location of Septage;(2) Implement methods to measure and/or monitor its discharges;(3) Submit discharge reports to the Authority;(4) Maintain and submit to the Authority records documenting the amount, origin, discharge location, and characteristic of Septage and/or Industrial Waste pumped, transported, and discharged, whether within or outside the Authority Sewerage System District;(5) Pay special service charges or fees;(6) Comply with Authority Septage monitoring, tracking, manifest, and ticketing procedures; and(7) Take any other action deemed necessary or appropriate by the Authority to help ensure compliance with 360 CMR 10.000 and/or local, state, and federal law.Amended by Mass Register Issue 1399, eff. 9/6/2019.