25 Pa. Code § 89.56

Current through Register Vol. 54, No. 50, December 14, 2024
Section 89.56 - Stream channel diversions
(a) Flow from perennial and intermittent streams within the permit area may be diverted if the diversions:
(1) Will not adversely affect, during and after mining, the water quantity and quality of the stream.
(2) Comply with other requirements of this chapter and Chapter 105 (relating to dam safety and waterway management).
(3) Comply with local, State and Federal statutes and regulations.
(b) When streamflow diversion is approved, the stream channel diversion shall be designed, constructed and removed, as follows:
(1) The longitudinal profile of the stream, the channel and the flood plain shall be designed and constructed to remain stable and to prevent, using the best technology currently available, additional contributions of suspended solids to streamflow or to runoff outside the permit area. These contributions may not be in excess of requirements of State or Federal law. Erosion control structures, such as channel lining structures, retention basins and artificial channel roughness structures shall be approved for permanent diversions only when they are stable and will require infrequent maintenance.
(2) The combination of channel, bank and flood plain configurations shall be adequate to prevent a flooding potential greater than that created by the natural conditions of the natural channel. However, the capacity of the channel itself shall be at least equal to the capacity of the unmodified stream channel immediately upstream and downstream from the diversion.
(3) The design and construction of stream channel diversions of perennial and intermittent streams shall be certified by a qualified registered professional engineer as meeting the performance standards of this part.
(c) When no longer needed to achieve the purpose for which they are authorized, temporary stream channel diversions shall be removed and the affected land regraded and revegetated, in accordance with §§ 89.84-89.86 (relating to backfilling and grading; topsoil use; and revegetation). At the time diversions are removed, facilities previously protected by the diversion shall be modified or moved to prevent overtopping or failure of the facilities. These requirements do not relieve the operator from maintenance of a water treatment facility otherwise required under this chapter, and the erosion and sedimentation control requirements of Chapter 102 (relating to erosion and sediment control).
(d) When permanent diversions are constructed or stream channels are restored after temporary diversion, the operator shall establish or restore:
(1) The natural riparian vegetation on the banks of the stream.
(2) The stream to a natural meandering shape.
(3) The stream to a longitudinal profile and cross section, including aquatic habitats, that approximate premining stream channel characteristics.

25 Pa. Code § 89.56

The provisions of this § 89.56 adopted July 30, 1982, 12 Pa.B. 2473, effective 7/31/1982, 12 Pa.B. 2382; amended June 15, 1990, 20 Pa.B. 3383, effective 7/27/1991, 21 Pa.B. 3316.

This section cited in 25 Pa. Code § 89.173 (relating to performance standards).