In addition to meeting the offset verification requirements in sections 95977 and 95977.1, Offset Project Operators or Authorized Project Designees must ensure the GHG emission reductions and GHG removal enhancements resulting from an offset project meet any additional verification requirements in the Compliance Offset Protocol, if applicable, for an offset project of that type.
Cal. Code Regs. Tit. 17, § 95977.2
Note: Authority cited: Sections 38510, 38560, 38562, 38570, 38571, 38580, 39600 and 39601, Health and Safety Code. Reference: Sections 38530, 38560.5, 38564, 38565, 38570 and 39600, Health and Safety Code.