Cal. Code Regs. tit. 17 § 95977.1

Current through Register 2024 Notice Reg. No. 44, November 1, 2024
Section 95977.1 - Requirements for Offset Verification Services
(a) Rotation of Verification Bodies. An offset project shall not have more than any six out of nine consecutive Reporting Periods verified by the same verification body or offset verification team member(s), unless otherwise specified in section 95977.1(a)(1) or (a)(2). The rotation requirements in this section are applied between the Offset Project Operator, Authorized Project Designee, if applicable, and any technical consultant(s) used by the Offset Project Operator or Authorized Project Designee, if applicable, and the verification body and offset verification team member(s) on an offset project basis.
(1) For offset projects developed under the Compliance Offset Protocol in section 95973(a)(2)(C) (1.), the following shall apply: Neither a verification body nor offset verification team member may conduct offset verification services for more than any six out of nine consecutive offset projects developed by any given Offset Project Operator, or developed on behalf of that Offset Project Operator by any Authorized Project Designee, or any technical consultant(s) used by the Offset Project Operator or Authorized Project Designee. For offset projects developed under the Compliance Offset Protocol in section 95973(a)(2)(C) (1.), the order of consecutive projects is determined by the project commencement dates. For this provision an offset project is defined by any activities reported in an Offset Project Data Report, and is applied to offset projects listed by the Offset Project Operator and Authorized Project Designee, if applicable.
(2) For reforestation offset projects developed under, and that meet the requirements of, the Compliance Offset Protocol in section 95973(a)(2)(C) (4.), and urban forest offset projects developed under, and that meet the requirements of, the Compliance Offset Protocol in section 95973(a)(2)(C) (3.), the following shall apply: An Offset Project Operator or Authorized Project Designee that has deferred the second verification for 6 to 12 years may have up to 13 Offset Project Data Reports verified by the same verification body and offset verification team member(s). If an Offset Project Operator or Authorized Project Designee has not deferred the second verification for more than 6 years, the requirements in section 95977.1(a) for rotation of verification bodies and offset verification team member(s) shall apply. An Offset Project Operator or Authorized Project Designee may contract with a previous verification body or offset verification team member(s) only if at least three consecutive Offset Project Data Reports for the offset project have been verified by a different verification body(ies) and offset verification team member(s) before the previous verification body and offset verification team member(s) is selected again. When rotating verification bodies and offset verification team members under this provision, the rotation requirements must also apply to any technical consultant(s) used by the Offset Project Operator or Authorized Project Designee, if applicable.
(3) All early action reporting periods for which regulatory verification was conducted for an early action offset project pursuant to the Program for Recognition of Early Action Offset Credits may count as one Reporting Period for the purposes of determining rotation of verification bodies and offset verification team members.
(4) Each early action reporting period for which early action verification was conducted under an Early Action Offset Program prior to transitioning the offset project to a Compliance Offset Protocol must be used in determining the rotation of verification bodies and offset verification team member pursuant to this section. Each early action reporting period verified under the Early Action Offset Program is considered a separate Reporting Period for purposes of this section.
(b) Offset Verification Services. Offset Verification Services shall be subject to the following requirements.
(1) Notice of Offset Verification Services for Offset Projects. Before offset verification services, as defined in section 95977.1(b)(3), may begin, the Offset Project Operator or Authorized Project Designee must submit the Offset Project Data Report to ARB or an Offset Project Registry, and the verification body must submit a Notice of Offset Verification Services to ARB and an Offset Project Registry, if applicable. The verification body may begin offset verification services for the Offset Project Operator or Authorized Project Designee 10 calendar days after the Notice for Offset Verification Services is received by ARB and the Offset Project Registry. The verification body may not conduct the site visit until at least 15 calendar days after the Notice for Offset Verification Services is received by ARB and the Offset Project Registry. If a verification is being audited by ARB pursuant to section 95977.1(b)(3)(W) or by an Offset Project Registry pursuant to section 95987(e) and if ARB or the Offset Project Registry notify the verification body of the audit in writing within five working days of receiving the Notice for Offset Verification Services, the verification body may not conduct the site visit until at least 40 calendar days after the Notice for Offset Verification Services is received by ARB and the Offset Project Registry, unless each auditing entity approves in writing an earlier site visit date. The Notice of Offset Verification Services must include the following information:
(A) The offset project name and its identification numbers, the Compliance Offset Protocol and its version under which the offset project is reporting, indication of whether a single or multiple reporting periods will receive offset verification services, the reporting period start and end dates, and the crediting period start date;
(B) A list of staff who will be designated to provide offset verification services as part of an offset verification team, including the names of each designated staff member, the lead verifier, independent reviewer, all subcontractors, and a description of the roles and responsibilities each team member will have during the offset verification process;
(C) Documentation that the offset verification team has the skills required to provide offset verification services for the Offset Project Operator or Authorized Project Designee. At least one offset verification team member must be accredited by ARB as an offset project specific verifier for an offset project of that type; and
(D) General information on the Offset Project Operator or Authorized Project Designee, including:
1. The name of the Offset Project Operator or Authorized Project Designee, including contact information, address, telephone number, and email address;
2. The locations that will be subject to offset verification services;
3. The date(s) of on-site visits, with address and contact information; and
4. A brief description of expected offset verification services to be performed, including the expected date for submitting the Offset Verification Statement to ARB or the Offset Project Registry.
(2) If any information submitted pursuant to sections 95977.1(b)(1)(B) and 95977.1(b)(1)(D) changes after the Notice for Offset Verification Services is submitted to ARB and the Offset Project Registry, if applicable, the verification body must notify ARB and the Offset Project Registry by submitting an updated Notice of Offset Verification Services within 10 working days. If the verification body has been notified by ARB or the Offset Project Registry of an audit for the relevant verification, then the verification body must notify the auditing entity at least two working days prior to a revised start date for offset verification services and at least 15 working days prior to a revised site visit date(s), unless each auditing entity approves in writing an earlier date. If ARB and the Offset Project Registry, if applicable, request revisions to the Notice of Offset Verification Services, the verification body must resubmit the revised Notice of Offset Verification Services within 10 working days of such request, or if there is a reason the verification body cannot submit the revisions within 10 working days, the verification body must communicate to ARB and the Offset Project Registry in writing as to the reasons why and get approval from the Offset Project Registry or ARB for an extension.
(3) Offset verification services must include the following:
(A) Offset Verification Plan. The Offset Project Operator or Authorized Project Designee must submit the following information necessary to develop an Offset Verification Plan to the offset verification team:
1. Information to allow the offset verification team to develop a general understanding of offset project boundaries, operations, project baseline emissions, and Reporting Period GHG reductions and GHG removal enhancements;
2. Information regarding the training or qualifications of personnel involved in developing the Offset Project Data Report;
3. The name and date of the Compliance Offset Protocol used to quantify and report project baselines, GHG reductions, GHG removal enhancements, and other required data as applicable in the Compliance Offset Protocol; and
4. Information about any data management system, offset project monitoring system, and models used to track project baselines, GHG reductions, GHG removal enhancements, and other required data as applicable in the Compliance Offset Protocol.
(B) Timing of Offset Verification Services. The Offset Verification Plan submitted pursuant to section 95977.1(b)(3)(A) shall also include the following information:
1. Dates of proposed meetings and interviews with personnel related to the offset project;
2. Dates of proposed site visits;
3. Types of proposed document and data reviews; and
4. Expected date for completing offset verification services.
(C) Planning Meetings with the Offset Project Operator or Authorized Project Designee. The offset verification team must discuss with the Offset Project Operator or Authorized Project Designee the scope of the offset verification services and request any information and documents needed for initiating offset verification services. The offset verification team must review the documents submitted and plan and conduct a review of original documents and supporting data for the Offset Project Data Report. Information regarding planning meetings may be included in the offset verification plan, but is not required. Any discussions or meetings to secure an offset verification services contract or collect preliminary project documents to bid the offset verification services may occur prior to submitting the Notice of Offset Verification Services pursuant to section 95977.1(b)(1).
(D) Site Visits for Offset Projects. For a non-sequestration offset project, at least one accredited offset verifier in the offset verification team, including the offset project specific verifier, must make at least one site visit for each Reporting Period that an Offset Project Data Report is submitted, except for those non-sequestration offset projects for which the Offset Project Data Reports qualify for a two-year offset verification period pursuant to section 95977(b). In this case, at least one offset verifier in the offset verification team, including the offset project specific verifier, must make a site visit each time offset verification services are performed; offset verification services for non-sequestration offset projects would include one or two Reporting Periods, depending on whether verification is eligible to be deferred pursuant to section 95977(b). For projects using protocols in section 95973(a)(2)(C)1., 2., or 3., if the project is no longer in operation and all destruction devices, metering and monitoring equipment has been removed, the site visit can occur at the offices of the Offset Project Operator, or Authorized Project Designee. Such a site visit cannot be used for reducing the invalidation timeframe in section 95985. For a forest or urban forest offset project, at least one accredited offset verifier in the offset verification team, including the offset project specific verifier, must make a site visit every year that offset verification services are provided, except for those offset projects approved for less intensive verification, for which a site visit must be performed at least once every six years. A site visit is also required after the first Reporting Period of an offset project under a Compliance Offset Protocol and after the first Reporting Period for each renewed crediting period under a Compliance Offset Protocol. Any site visit performed under this section must be conducted after the Offset Project Operator or Authorized Project Designee submits its Offset Project Data Report to ARB or an Offset Project Registry. During the required verification, the offset verification team member(s) must conduct the following, and document or explain how each requirement was checked and fulfilled in the detailed verification report:
1. During the initial verification conducted following the first Reporting Period of the crediting period the offset verification team members must complete all of the following requirements, either during the required site visit or as part of a desk review:
a. Assess offset project eligibility and that the offset project meets the requirements for additionality according to section 95973 and the applicable Compliance Offset Protocol;
b. Review the information submitted for listing pursuant to section 95975 and determine if it is complete and accurate;
c. Confirm that the offset project boundary is appropriately defined;
d. Review project baseline calculations and modeling;
e. Assess the operations, functionality, data control systems, and review GHG measurement and monitoring techniques; and
f. Confirm that all applicable eligibility criteria to design, measure, establish the chain of custody, and monitor the offset project conforms to the requirements of the applicable Compliance Offset Protocol.
g. All criteria pertaining to the eligibility of the offset project must be assessed during the first site visit in the first Reporting Period of each crediting period. All eligibility criteria must be met and are not subject to sampling. If any of the eligibility criteria are not met, the project would be ineligible for crediting and receive an Adverse Offset Verification Statement.
2. During the initial verification conducted following the first Reporting Period of the crediting period and each subsequent verification the offset verification team must complete all of the following requirements, either during the required site visit or as part of a desk review:
a. Check that all offset project boundaries, GHG emissions sources, GHG sinks, and GHG reservoirs in the applicable Compliance Offset Protocol are identified appropriately;
b. Review and understand the data management systems used by the Offset Project Operator or Authorized Project Designee to track, quantify, and report GHG reductions, GHG removal enhancements, or other data required as applicable in the Compliance Offset Protocol. This includes reviewing data collection processes and procedures, sampling techniques and metering accuracy, quality assurance/quality control processes and procedures, and missing data procedures. The offset verification team member(s) must evaluate the uncertainty and effectiveness of these systems;
c. Interview key personnel involved in collecting offset project data and preparing the Offset Project Data Report;
d. Make direct observations of equipment for data sources and equipment supplying data for GHG emission sources in the sampling plan determined to be high risk;
e. Collect and review other information that, in the professional judgment of the team, is needed in the offset verification process;
f. Confirm the offset project conforms with all local, state, or federal environmental regulatory requirements pursuant to section 95973(b), including health and safety regulations; and
g. Review all chain of custody documents as required in the Compliance Offset Protocol, if applicable.
h. If the offset project is found by the offset verification team to not meet the requirements of section 95977.1(b)(3)(D)2.f., the offset project is ineligible to receive ARB offset credits or registry offset credits for some or all GHG reductions and GHG removal enhancements quantified and reported in the Offset Project Data Report.
(E) The offset verification team must review offset project operations to identify applicable GHG emissions sources, project emissions, GHG sinks, and GHG reservoirs required to be included and quantified in the Offset Project Data Report as required by the applicable Compliance Offset Protocol. This must include a review of each type of GHG emissions source, GHG sink, and GHG reservoir to ensure that all GHG emissions sources, GHG sinks, and GHG reservoirs required to be reported for the offset project are properly included in the Offset Project Data Report.
(F) An Offset Project Operator or Authorized Project Designee must make available to the offset verification team all information and documentation used to calculate and report project baseline and project GHG emissions, GHG reductions, and GHG removal enhancements and other information required by the applicable Compliance Offset Protocol.
(G) Sampling Plan for Offset Project Data Reports. As part of confirming the Offset Project Data Report, the offset verification team must develop a sampling plan that meets the following requirements:
1. The offset verification team must develop a sampling plan based on a strategic analysis developed from document reviews and interviews to assess the likely nature, scale, and complexity of the offset verification services for an Offset Project Operator or Authorized Project Designee. The analysis must review the inputs for the development of the submitted Offset Project Data Report, the rigor and appropriateness of the GHG data management systems, and the coordination within an Offset Project Operator's or Authorized Project Designee's organization to manage the operation and maintenance of equipment and systems used to develop the Offset Project Data Reports;
2. The offset verification team must include a ranking of GHG emissions sources, GHG sinks, and GHG reservoirs within the offset project boundary by amount of contribution to total CO2e emissions, GHG reductions, and GHG removal enhancements, and a ranking of GHG emissions sources, GHG sinks, or GHG reservoirs with the largest calculation uncertainty; and
3. The offset verification team must include a qualitative narrative of uncertainty risk assessment in the following areas as applicable to the Compliance Offset Protocol:
a. Data acquisition equipment;
b. Data sampling and frequency;
c. Data processing and tracking;
d. Project baseline and project GHG emissions, GHG reductions, and GHG removal enhancement calculations;
e. Data reporting; and
f. Management policies or practices in developing Offset Project Data Reports.
(H) After completing the analysis in section 95977.1(b)(3)(G), the offset verification team must include in the sampling plan a list which includes the following:
1. GHG emissions sources, GHG sinks, and GHG reservoirs that will be targeted for document reviews to ensure conformance with the Compliance Offset Protocol and data checks as specified in section 95977.1(b)(3)(L) and an explanation of why they were chosen;
2. Methods used to conduct data checks for each GHG emissions source, GHG sink, and GHG reservoir; and
3. A summary of the information analyzed in the data checks and document reviews conducted for each GHG emissions source, GHG sink, and GHG reservoir.
(I) The sampling plan list, prepared pursuant to section 95977.1(b)(3)(H), must be updated and finalized prior to the completion of offset verification services. The final sampling plan must describe in detail how the GHG emissions sources, GHG sinks, and GHG reservoirs with identified risk, subject to data checks, were reviewed for accuracy.
(J) The offset verification team must revise the sampling plan to describe tasks completed or needed to be completed by the offset verification team as relevant information becomes available and potential issues emerge of offset material misstatement or nonconformance with the requirements of the Compliance Offset Protocol and this article.
(K) The verification body must retain the sampling plan in paper, electronic, or other format for a period of not less than 15 years following the submission of each Offset Verification Statement. The sampling plan must be made available at any time during offset verification services to ARB or the Offset Project Registry within 10 calendar days upon request. The verification body must also retain all material received, reviewed, or generated to render an Offset Verification Statement for an Offset Project Operator or Authorized Project Designee for 15 years following the submittal of each Offset Verification Statement. The documentation must allow for a transparent review of how a verification body reached its conclusion in the detailed verification report and Offset Verification Statement.
(L) Data Checks for Offset Project Data Reports. To determine the reliability of the submitted Offset Project Data Report, the offset verification team must use data checks. Such data checks must focus first on the largest and most uncertain estimates of project baseline GHG emissions, project emissions, GHG reductions, and GHG removal enhancements, and the offset verification team must:
1. Use data checks to ensure that the appropriate methodologies and GHG emission factors have been applied in calculating the project baseline and Reporting Period GHG emissions, project emissions, GHG reductions, and GHG removal enhancements calculations in the Compliance Offset Protocol;
2. Choose GHG emissions sources, project emissions, GHG sinks, and GHG reservoirs for data checks based on their relative sizes and risks of offset material misstatement or nonconformance as indicated in the sampling plan;
3. Use professional judgment in the number of data checks required for the offset verification team to conclude with reasonable assurance whether the Offset Project Operator's or Authorized Project Designee's total reported GHG reductions and GHG removal enhancements are free of offset material misstatement and the Offset Project Data Report otherwise conforms to the requirements of the Compliance Offset Protocol and this article. At a minimum a data check must include the following:
a. Tracing data in the Offset Project Data Report to its origin;
b. Looking at the process for data compilation and collection;
c. Reviewing all GHG inventory designs for GHG sources, GHG sinks, and GHG reservoirs, and sampling procedures, if applicable;
d. Recalculating baseline GHG emissions, project emissions, GHG reductions, and GHG removal enhancements estimates to check original calculations;
e. Reviewing calculation methodologies used by the Offset Project Operator or Authorized Project Designee for conformance with the Compliance Offset Protocol and this article;
f. Reviewing meter and fuel analytical instrumentation calibration, if applicable; and
g. Reviewing the quantification from models approved for use in the Compliance Offset Protocol, if applicable; and
4. Compare its own calculated results for the data checks conducted with the reported offset project data in order to confirm the extent and impact of any omissions and errors. Any discrepancies must be identified in the issues log. The comparison of data checks must also include a narrative to indicate which GHG emissions sources, GHG sinks, and GHG reservoirs were checked, the types and quantity of data that were evaluated for each GHG emissions source, GHG sink, and GHG reservoir, how the data checks were conducted including calculations, and any discrepancies that were identified.
(M) Offset Project Data Report Modifications. As a result of review by the offset verification team and prior to completion of an Offset Verification Statement, the Offset Project Operator or Authorized Project Designee must make any possible improvements and fix correctable errors that affect GHG emissions reductions or removal enhancements in the submitted Offset Project Data Report, and a revised Offset Project Data Report must be submitted to ARB or the Offset Project Registry. Correctable errors that, when summed, result in less than a three percent (3.00%) overstatement of the GHG emissions reductions or removal enhancements do not need to be fixed. Errors subject to the three percent exception still constitute errors for purposes of this Regulation, and the Offset Project Operator and Authorized Project Designee, if applicable, are still subject to the requirements of sections 96013 and 96014(d). The revised Offset Project Data Report must include all components required in section 95976(d). If the Offset Project Operator or Authorized Project Designee does not make all possible improvements and fix any correctable errors to the Offset Project Data Report, the verification body must issue an Adverse Offset Verification Statement. The offset verification team shall use professional judgment in the determination of correctable errors, including whether differences are not errors but result from truncation or rounding. The offset verification team must document in the issues log the source of any difference identified, including whether the difference results in a correctable error. Documentation for all Offset Project Data Report submittals must be retained by the Offset Project Operator or Authorized Project Designee for the length of time specified in section 95976(e)(2).
(N) To verify that the Offset Project Data Report is free of offset material misstatement, the offset verification team must make its own determination of GHG reductions or GHG removal enhancements relative to the project baseline using the data check conducted pursuant to section 95977.1(b)(3)(L), and must determine whether there is reasonable assurance that the Offset Project Data Report does not contain an offset material misstatement for the Offset Project Operator or Authorized Project Designee, on a CO2e basis. To assess conformance with this article and the Compliance Offset Protocol the offset verification team must review the methods and factors used to develop the Offset Project Data Report for adherence to the requirements of this article and the Compliance Offset Protocol and ensure that other requirements of this article are met.
(O) Issues Log. The offset verification team must keep a log of any issues identified in the course of offset verification services that may affect determinations of offset material misstatement and nonconformance. The issues log must identify the section of this article or Compliance Offset Protocol related to the nonconformance, if applicable, and indicate that the issues were corrected by the Offset Project Operator or Authorized Project Designee prior to completing the offset verification services. Any other concerns that the offset verification team has with the preparation of the Offset Project Data Report must be documented in the issues log. The issues log must indicate whether the issues could have any bearing on offset material misstatement or conformance.
(P) An assessment of offset material misstatement is conducted for net GHG reductions and GHG removal enhancements achieved in a given Reporting Period relative to the project baseline in that Reporting Period in metric tons of CO2e.
(Q) The offset verification team must determine whether the GHG reductions and GHG removal enhancements quantified and reported in the Offset Project Data Report contain an offset material misstatement using the following equation:

Click here to view image

Where:

"Discrepancies" means any differences between the reported GHG value for sources, sinks, and reservoirs for the project baseline or project, and the verifier calculated GHG value for a data source subject to data checks in 95977.1(b)(3)(L) calculated by the offset verification team. Any discrepancies identified must include the positive or negative impact of the GHG source, sink, or reservoir on the total reported GHG emission reductions and removal enhancements when input into the offset material misstatement equation.

"Omissions" means any GHG emissions or removal enhancements associated with required sources, sinks, and reservoirs for the project baseline or project emissions, that the offset verification team concludes must be part of the Offset Project Data Report, but were not included by the Offset Project Operator or Authorized Project Designee in the Offset Project Data Report. Any omissions found by the offset verification team must include the positive or negative impact of the omission on the total reported GHG emission reductions and removal enhancements when input into the offset material misstatement equation.

"Misreporting" means duplicative, incomplete, or other GHG emissions or removal enhancements for required sources, sinks, and reservoirs in the project baseline or project emissions, the offset verification team concludes should, or should not, be part of the Offset Project Data Report. Any misreporting found by the offset verification team must include the positive or negative impact of the misreporting on the total reported GHG emission reductions and removal enhancements when input into the offset material misstatement equation.

"Total reported emission reductions and removal enhancements" means net GHG reductions and GHG removal enhancements reported by the Offset Project Operator or Authorized Project Designee for an Offset Project Data Report relative to the project baseline for that Offset Project Data Report in metric tons CO2e.

(R) Offset verification services are not complete until ARB offset credits are issued for the GHG emission reductions and GHG removal enhancements reported in an Offset Project Data Report. Offset verification services must include:
1. Offset Verification Statement. Prior to completion of the offset verification services conducted pursuant to section 95977.1(b)(3), the verification body must complete an Offset Verification Statement for each Offset Project Data Report for which offset verification services were conducted and provide it to the Offset Project Operator or Authorized Project Designee and ARB or the Offset Project Registry by the verification deadline pursuant to section 95977(d). Before the Offset Verification Statement is completed, the verification body must have the offset verification services and findings of the offset verification team independently reviewed within the verification body by an independent reviewer not involved in offset verification services for that offset project. The independent reviewer may not be the offset project specific verifier, and may not accompany the offset verification team on a site visit. The independent reviewer may conduct a separate site visit, if necessary.
2. The independent reviewer shall serve as the final check of the offset verification team's work to identify any significant concerns, including:
a. Errors in planning;
b. Errors in data sampling; and
c. Errors in judgment by the offset verification team that are related to the draft offset verification statement.
3. The independent reviewer must maintain independence from the offset verification services by not making specific recommendations about how the offset verification services should be conducted. The independent reviewer will review documents applicable to the offset verification services provided and identify any failure to comply with the requirements of this article or with the verification body's internal policies and procedures for providing offset verification services. The independent reviewer must concur with the offset verification findings before the Offset Verification Statement can be issued.
4. When the offset verification team completes its findings:
a. The verification body must provide to the Offset Project Operator or Authorized Project Designee a detailed verification report for each Offset Project Data Report for which offset verification services were conducted. The detailed verification report must at a minimum include the Offset Verification Plan, the detailed comparison of the data checks conducted during offset verification services pursuant to section 95977.1(b)(3)(L), including the required narrative, the issues log identified in the course of offset verification activities and the issue resolutions, and any qualifying comments on findings during offset verification services. The detailed verification report must also include the calculations performed in 95977.1(b)(3)(Q) with enough detail to understand the relationships between the data checks and the offset material misstatement evaluation, and be made available to ARB within 10 calendar days upon request. If the Offset Verification Statement is being submitted to an Offset Project Registry, then the verification body must submit the detailed verification report to the Offset Project Registry with the Offset Verification Statement. The detailed verification report must be submitted to the Offset Project Operator or Authorized Project Designee at the same time or before the Offset Verification Statement is submitted to ARB or the Offset Project Registry.
b. The verification body must provide the Offset Verification Statement to the Offset Project Operator or Authorized Project Designee and ARB or the Offset Project Registry, attesting to ARB whether the verification body has found the submitted Offset Project Data Report to be free of offset material misstatement, and whether the Offset Project Data Report is in conformance with the requirements of this article and the Compliance Offset Protocol.
c. A Compliance Offset Protocol may restrict the use of a Qualified Positive Offset Verification Statement for certain project types, in which case the verification body must submit either a Positive Offset Verification Statement or an Adverse Offset Verification Statement. In the case of a Qualified Positive Offset Verification Statement, when not restricted by a Compliance Offset Protocol, the verification body will qualify the Offset Verification Statement to indicate any nonconformances allowed for a qualified Positive Offset Verification Statement as defined in section 95802 contained within the Offset Project Data Report and that these nonconformances do not result in an offset material misstatement.
d. The offset verification team must have a final discussion with the Offset Project Operator or Authorized Project Designee explaining their findings and notifying the Offset Project Operator or Authorized Project Designee of any unresolved issues noted in the issues log before the Offset Verification Statement is finalized and submitted to the Offset Project Registry or ARB.
e. The lead verifier in the offset verification team must attest to ARB in the Offset Verification Statement that the offset verification team has carried out all offset verification services as required by this article, and the lead verifier who has conducted the independent review of offset verification services and findings must attest to his or her independent review on behalf of the verification body and his or her concurrence with the offset verification findings.
f. The lead verifier must attest in the Offset Verification Statement, in writing, to ARB as follows:

"I certify under penalty of perjury under the laws of the State of California that the offset verification team has carried out all offset verification services as required by sections 95977.1, 95977.2, and the applicable Compliance Offset Protocol and the findings are true, accurate, and complete and have been independently reviewed by an independent reviewer as required under sections 95977.1(b)(3)(R) (1.) through 95977.1(b)(3)(R)(3.)."

5. Prior to the verification body providing an Adverse Offset Verification Statement to ARB or the Offset Project Registry, the Offset Project Operator or Authorized Project Designee must be provided at least 10 working days to modify the Offset Project Data Report to correct any offset material misstatement or nonconformance found by the offset verification team. The modified Offset Project Data Report and Offset Verification Statement must be submitted to ARB or the Offset Project Registry by the applicable verification deadline, unless the Offset Project Operator or Authorized Project Designee makes a request to ARB pursuant to section 95977.1(b)(3)(R)6.
6. If the Offset Project Operator or Authorized Project Designee and the verification body cannot reach agreement on modifications to the Offset Project Data Report that result in a Positive Offset or Qualified Positive Offset Verification Statement due to a disagreement on the requirements of this article or Compliance Offset Protocol, the Offset Project Operator or Authorized Project Designee may petition ARB to make a decision as to the verifiability of the submitted Offset Project Data Report.
7. If ARB determines that the Offset Project Data Report does not meet the standards and requirements specified in this article, the Offset Project Operator or Authorized Project Designee must provide any additional information within 30 calendar days of the ARB determination. ARB will review the new information and notify the Offset Project Operator or Authorized Project Designee and verification body of its final decision. In re-verifying a revised Offset Project Data Report, the verification body and offset verification team shall be subject to the requirements in sections 95977.1(b)(3)(R)1. through 95977.1(b)(3)(R)4. and must submit the revised Offset Verification Statement to ARB or the Offset Project Registry within 15 calendar days.
8. If ARB or the Offset Project Registry determines that the detailed verification report required pursuant to 95977.1(b)(3)(R)4.a. does not contain sufficient information to substantiate the attestations in the Offset Verification Statement, then the verification body must submit a revised verification report and a revised Offset Verification Statement to ARB or the Offset Project Registry within 15 calendar days of the determination.
(S) Upon submission of the Offset Verification Statement to ARB or the Offset Project Registry, the Offset Project Data Report must be considered final and no further changes may be made by the Offset Project Operator or Authorized Project Designee unless the Offset Project Registry or ARB requests any changes as part of their review. Once ARB offset credits are issued for the Offset Project Data Report, all offset verification requirements of this article shall be considered complete for the applicable Offset Project Data Report.
(T) If the Executive Officer finds a high level of conflict of interest existed between a verification body and an Offset Project Operator or Authorized Project Designee pursuant to section 95979(b)(4) and section 95979(b)(5), or an Offset Project Data Report that received a Positive Offset or Qualified Positive Offset Verification Statement fails an ARB audit, the Executive Officer may set aside the Positive Offset or Qualified Positive Offset Verification Statement submitted by the verification body and require the Offset Project Operator or Authorized Project designee to have the Offset Project Data Report re-verified by a different verification body within 90 calendar days of this finding.
(U) Upon request by ARB or the Offset Project Registry, the Offset Project Operator or Authorized Project Designee must provide the data used to generate an Offset Project Data Report, including all data available to the offset verification team in the conduct of offset verification services, within 10 working days of the request.
(V) Upon request by ARB or the Offset Project Registry the verification body must provide ARB or the Offset Project Registry the detailed verification report given to the Offset Project Operator or Authorized Project Designee, as well as the sampling plan, contracts for offset verification services, and any other supporting documentation. All documentation must be provided by the verification body to ARB or the Offset Project Registry within 10 working days of the request.
(W) Upon written notification by ARB the verification body and its staff must be available for an offset verification services audit when providing offset verification services for an offset project listed with ARB or an Offset Project Registry using a Compliance Offset Protocol.

Cal. Code Regs. Tit. 17, § 95977.1

1. New section filed 12-13-2011; operative 1-1-2012 pursuant to Government Code section 11343.4 (Register 2011, No. 50).
2. Change without regulatory effect amending subsections (b)(3)(D)2.h.-i., (b)(3)(R)4.f., (b)(3)(R)5. and (b)(3)(R)7. filed 2-15-2012 pursuant to section 100, title 1, California Code of Regulations (Register 2012, No. 7).
3. Amendment filed 6-26-2014; operative 7-1-2014 pursuant to Government Code section 11343.4(b)(3) (Register 2014, No. 26).
4. Amendment filed 9-18-2017; operative 10-1-2017 pursuant to Government Code section 11343.4(b)(3) (Register 2017, No. 38).
5. Amendment of subsections (b)(1)-(b)(1)(A), (b)(1)(D)4., (b)(2) and (b)(3)(M) filed 3-29-2019; operative 3-29-2019 pursuant to Government Code section 11343.4(b)(3) (Register 2019, No. 13).

Note: Authority cited: Sections 38510, 38560, 38562, 38570, 38571, 38580, 39600 and 39601, Health and Safety Code. Reference: Sections 38530, 38560.5, 38564, 38565, 38570 and 39600, Health and Safety Code.

1. New section filed 12-13-2011; operative 1-1-2012 pursuant to Government Code section 11343.4 (Register 2011, No. 50).
2. Change without regulatory effect amending subsections (b)(3)(D)2.h.-i., (b)(3)(R)4.f., (b)(3)(R)5. and (b)(3)(R)7. filed 2-15-2012 pursuant to section 100, title 1, California Code of Regulations (Register 2012, No. 7).
3. Amendment filed 6-26-2014; operative 7/1/2014 pursuant to Government Code section 11343.4(b)(3) (Register 2014, No. 26).
4. Amendment filed 9-18-2017; operative 10/1/2017 pursuant to Government Code section 11343.4(b)(3) (Register 2017, No. 38).
5. Amendment of subsections (b)(1)-(b)(1)(A), (b)(1)(D)4., (b)(2) and (b)(3)(M) filed 3-29-2019; operative 3/29/2019 pursuant to Government Code section 11343.4(b)(3) (Register 2019, No. 13).