Current through the 2024 Budget Session
Section 41-3-301 - Application for reservoir construction permit; contents; procedure(a) Any person, corporation, association, or organization, of any nature whatsoever, hereafter intending to store or impound, for beneficial uses, any of the unappropriated waters of the state of Wyoming, shall, before commencing construction of any works for such purpose, or performing any work in connection with said proposed construction, make an application to the state engineer, for a permit to construct a reservoir. The application must set forth the name and post office address of the applicant; the source of the water supply; the nature of the proposed use; the location and description of the proposed work; the time within which it is proposed to begin construction, and the time required for the completion of construction. Maps and plans shall conform with the provisions of W.S. 41-4-510. In case of reservoirs where the storage is for stock purposes only and the capacity does not exceed twenty (20) acre-feet and the height of dam does not exceed twenty (20) feet, the state engineer may issue a permit without the filing of a map; however the state engineer may require certain information be submitted on special forms to be furnished or designated by him. Any violation of subsection (a) of this section shall be punishable pursuant to W.S. 41-3-616 with the exception that the owner of any unpermitted reservoir with a capacity of twenty (20) acre-feet or less and a dam height of twenty (20) feet or less shall have forty-five (45) days after receipt of the written notice of violation pursuant to W.S. 41-3-616(a), to submit an application for a permit. The application shall meet the requirements of the state engineer's office. Each day of the forty-five (45) days shall not be counted as a separate violation if the application for a reservoir permit is received during this forty-five (45) day period.(b) For reservoir permits issued in conjunction with the national pollutant discharge elimination system (NPDES) for mining operations, the state engineer shall promptly review the application and advise the applicant in writing if it is complete, within thirty (30) days. If the application is complete, or is resubmitted to the satisfaction of the state engineer, it shall be approved or denied within forty-five (45) days of this determination: (i) For the purpose of this subsection "complete" means that the application contains all the essential and necessary elements and is acceptable for further review for substance and compliance with the provisions of this chapter.