Utah Code § 73-10g-405

Current through the 2024 Fourth Special Session
Section 73-10g-405 - Great Salt Lake related post-construction storm water management
(1) As used in this section:
(a) "Storm water" means the same as that term is defined in Section 19-5-108.5.
(b) "Storm water permit" means the same as that term is defined in Section 19-5-108.5.
(2)
(a) As part of the integrated water assessment, the division shall study the impact of low impact development best management practices associated with post-construction retention storm water permit requirements on the water budget of the Great Salt Lake.
(b) As part of the study under this section, the division shall:
(i) coordinate with the Division of Water Quality; and
(ii) when appropriate, seek information from the United States Environmental Protection Agency.
(3) Notwithstanding Section 73-10g-404, the division shall complete the study required by this section and issue a final report to the Natural Resources, Agriculture, and Environment Interim Committee by no later than the November 2023 interim meeting of the Natural Resources, Agriculture, and Environment Interim Committee.

Utah Code § 73-10g-405

Added by Chapter 81, 2022 General Session ,§ 5, eff. 5/4/2022.