The commission shall provide for a 30-day comment period in the review process for Edwards Aquifer Protection Plans in the Contributing Zone of the Edwards Aquifer as provided in 30 T.A.C. Section 213.4(a)(2).
Tex. Water Code § 26.137
The commission shall provide for a 30-day comment period in the review process for Edwards Aquifer Protection Plans in the Contributing Zone of the Edwards Aquifer as provided in 30 T.A.C. Section 213.4(a)(2).
Tex. Water Code § 26.137