Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 38.077 - Load Shedding Exercises(a) The commission and the independent organization certified for the ERCOT power region shall conduct simulated or tabletop load shedding exercises with providers of electric generation service and transmission and distribution service in the ERCOT power region.(b) The commission shall ensure that each year at least one simulated or tabletop exercise is conducted during a summer month and one simulated or tabletop exercise is conducted during a winter month.Added by Acts 2021, 87th Leg., R.S., Ch. 426 (S.B. 3), Sec. 16, eff. June 8, 2021.