Current through the 2024 Regular Session
Section 47.60.385 - Terminal improvement, vessel improvement, and vessel acquisition project funding requests-Predesign study-Prioritization(1) Terminal improvement, vessel improvement, and vessel acquisition project funding requests must adhere to the capital plan, include route-based planning, and be submitted with a predesign study that:(a) Includes all elements required by the office of financial management;(b) Separately identifies basic terminal and vessel elements essential for operation and their costs;(c) Separately identifies additional elements to provide ancillary revenue and customer comfort and their costs;(d) Includes construction phasing options that are consistent with forecasted ridership increases;(e) Separately identifies additional elements requested by local governments and the cost and proposed funding source of those elements;(f) Separately identifies multimodal elements and the cost and proposed funding source of those elements;(g) Identifies all contingency amounts;(h) Identifies any terminal, vessel, or other capital modifications that would be required as a result of the proposed capital project;(i) Includes planned service modifications as a result of the proposed capital project, and the consistency of those service modifications with the capital plan; and(j) Demonstrates the evaluation of long-term operating costs including fuel efficiency, staffing, and preservation.(2) The department shall prioritize vessel preservation and acquisition funding requests over vessel improvement funding requests.Amended by 2010 c 283, § 6, eff. 4/1/2010.2008 c 124 § 6; 2007 c 512 § 14.Findings-Intent-Effective date- 2010 c 283 : See notes following RCW 47.60.355.
Finding-Intent-2007 c 512: See note following RCW 47.06.140.