Current through 2024, ch. 69
Section 62-16B-3 - Community solar facility requirementsA. A community solar facility shall:(1) have a nameplate capacity rating of five megawatts alternating current or less;(2) be located in the service territory of the qualifying utility and be interconnected to the electric distribution system of that qualifying utility;(3) have at least ten subscribers;(4) have the option to be co-located with other energy resources, but shall not be co-located with other community solar facilities;(5) not allow a single subscriber to be allocated more than forty percent of the generating capacity of the facility; and(6) make at least forty percent of the total generating capacity of a community solar facility available in subscriptions of twenty-five kilowatts or less.B. The provisions of this section shall not apply to a native community solar project; provided that a native community solar project shall be located in the service territory of a qualifying utility and be interconnected to the electric distribution system of that qualifying utility.