Before a contract is executed for the construction, major alteration or renovation of a state-owned building, the division may have a feasibility study made on the use of energy sources other than fossil fuels for the heating and air conditioning of the proposed building. A copy of the feasibility study shall remain on file with the division and shall be open to public inspection.
NMS § 15-3B-12