Current through the 2024 Regular Session
Section 17-17-229 - Facility permits for nonhazardous solid waste management; application requirements and criteria(1) After approval of a local nonhazardous solid waste management plan by the commission, neither the department, the permit board nor any other agency of the State of Mississippi shall issue any permit, grant or loan for any nonhazardous solid waste management facility in a county, municipality region, or district which is not consistent with the approved local nonhazardous solid waste management plan.(2) The commission shall adopt criteria to be considered in location and permitting of nonhazardous solid waste management facilities. The criteria shall be developed through public participation, shall be enforced by the permit board and shall include, in addition to all applicable state and federal rules and regulations, consideration of:(a) Hydrological and geological factors, such as floodplains, depth to water table, soil composition, and permeability, cavernous bedrock, seismic activity, and slope;(b) Natural resources factors, such as wetlands, endangered species habitats, proximity to parks, forests, wilderness areas and historical sites, and air quality;(c) Land use factors, such as local land use, whether residential, industrial, commercial, recreational, agricultural, proximity to public water supplies, and proximity to incompatible structures such as schools, churches and airports;(d) Transportation factors, such as proximity to waste generators and to population, route safety and method of transportation; and(e) Aesthetic factors, such as the visibility, appearance and noise level of the facility.(3) Notwithstanding any provision of this chapter, no solid waste management plan shall include a proposed new municipal solid waste landfill in any county that has two (2) or more existing permitted municipal solid waste landfills and such new landfill will be located within a five (5) mile radius of an existing municipal solid waste landfill, unless a referendum election has been conducted and approved pursuant to Section 17-17-237. This subsection (3) shall not apply to the proposed expansion or replacement of any permitted landfill by the permit holder, and shall not apply to any rubbish disposal facilities, transfer stations, land application sites, composting facilities, solid waste processing facilities, chipping/mulching facilities, industrial/institutional/special waste landfills, industrial/institutional/special waste rubbish sites, waste tire processing facilities, commercial waste tire collection sites, local government waste tire collection sites or generator waste tire collection sites, and none of those facilities, stations, landfills or sites shall be counted as a landfill within a county for the purpose of determining whether a referendum election is required to be conducted in the county as provided in this section.Laws, 1991, ch. 494, § 16; Laws, 1998, ch. 498, § 3; Laws, 2006, ch. 587, § 2, eff. 7/1/2006.Amended by Laws, 2021, ch. 308, HB 949,§ 2, eff. 3/10/2021.