The commissioner may require the installation and maintenance of monitoring equipment to evaluate water resource impacts from permitted appropriations and proposed projects that require a permit. Monitoring for water resources that supply more than one appropriator must be designed to minimize costs to individual appropriators. The cost of drilling additional monitoring wells must be shared proportionally by all permit holders that are directly affecting a particular water resources feature.
Monitoring installations required under subdivision 1 must be equipped with automated measuring devices to measure water levels, flows, or conditions. The commissioner may determine the frequency of measurements and other measuring methods based on the quantity of water appropriated or used, the source of water, potential connections to other water resources, the method of appropriating or using water, seasonal and long-term changes in water levels, and any other facts supplied to the commissioner.
Minn. Stat. § 103G.282
2010 c 361 art 4 s 53; 2012 c 272 s 51