Section 82a-713 - Same; limiting time for perfection of appropriation; extension

The chief engineer shall limit the time for the perfecting of an appropriation to a reasonable period within which the proposed works can be completed by expeditious procedure, and he or she shall for good cause shown by the applicant allow an extension of time.