The fee for:
is two hundred dollars ($200) if the need for the letter of extension, or renewal, is occasioned by the act or omission of the permittee. The commission shall waive the fee for a letter of extension, and a renewal, if the need for the letter of extension, or renewal, is occasioned by the act or omission of the commission, a local board, or a third party unrelated to the permittee involved and not employed by the permittee or under the control of the permittee. From each fee collected under this section, fifty dollars ($50) shall be deposited in the state general fund, and the remainder shall be deposited in the enforcement and administration fund under IC 7.1-4-10.
IC 7.1-4-4.1-7