Current through P.L. 171-2024
Section 14-29-4-4 - Permits; fees A person who desires to construct a channel must do the following:
(1) File a verified written application for a permit with the commission that does the following: (A) States the material facts.(B) Includes the plans and specifications for the construction of the channel.(C) Identifies each facility to which the channel will provide access.(2) Subject to IC 14-10-2-1, include with the application a nonrefundable minimum fee of one hundred dollars ($100).Pre-1995 Recodification Citation: 13-2-18.5-4.
Amended by P.L. 195-2017,SEC. 49, eff. 7/1/2017.As added by P.L. 1-1995, SEC.22.