Mass. Gen. Laws ch. 146 § 6

Current through Chapter 373 of the 2024 Legislative Session, with the exception of Acts not available as of 1/14/2025
Section 146:6 - Annual inspection; extension of time; first inspection

All steam boilers and their appurtenances except those specified in the following section shall be thoroughly inspected externally and internally at least once a year. Upon written application made to it by the owner or user of a pressure vessel or boiler, the board may, when the public interest and convenience require, extend the time for the making of such inspection for a period not to exceed six months as the board may determine. A district engineering inspector of the division of inspection of the department of fire services shall perform the first inspection of a pressure vessel required by this chapter.

Mass. Gen. Laws ch. 146, § 6

Amended by Acts 2017, c. 6,§ 131, eff. 3/27/2017.