This section is provided to encourage new technology and equipment and provide a process for evaluating and permitting designs that deviate from this rule. The proposed construction of facilities and processes not in compliance with this rule may be permitted provided that the facility, when constructed and operated, meets the objective of these rules.
(a) Each application for a permit to construct shall include an engineering design report, detailed construction plans, and technical specifications for all piping, tanks, and equipment. All of the documents shall have a suitable title showing the owner's name and the Wyoming registration number, seal, and signature of the engineer.
(b) Each application for a permit to construct will be evaluated on a case-by-case basis using the best available technology. The application shall include at least one of the following:
(c) If an applicant wishes to construct a pilot plant to provide data necessary to show the design will meet the purpose of the act, a permit to construct must be obtained.
020-25 Wyo. Code R. § 25-6
Amended, Eff. 7/27/2016.
Amended, Eff. 6/29/2018.