The design standards, material requirements or performance criteria of this chapter may be supplemented or superseded by more stringent requirements, including pretreatment requirements, more stringent design limitations, and more frequent or stringent effluent or groundwater monitoring requirements, if:
(1) There is an increased possibility of groundwater contamination due to structure location, soil types, geologic condition or other conditions, or(2) The stored or treated material may contain any substance or concentration of substances not normally associated with the type of discharges identified in s. NR 213.02(1), such as toxic substances or hazardous wastes, or(3) The storage structure or treatment unit may cause a public nuisance.Wis. Admin. Code Department of Natural Resources NR 213.05
Cr. Register, June, 1990, No. 414, eff. 7-1-90.