Wis. Admin. Code Department of Natural Resources NR 151.122

Current through November 25, 2024
Section NR 151.122 - Total suspended solids performance standard
(1) REQUIREMENT. BMPs shall be designed, installed and maintained to control total suspended solids carried in runoff from the post-construction site. BMPs shall be designed in accordance with Table 1., or to the maximum extent practicable as provided in sub. (3). The design shall be based on an average annual rainfall, as compared to no runoff management controls.

Table 1. TSS Reduction Standards

Development Type

TSS Reduction

New Development

80 percent

In-fill >= 5 acres

80 percent

In-fill < 5 acres on or after October 1, 2012

80 percent

Redevelopment

40 percent of load from parking areas and roads

In-fill < 5 acres and before October 1, 2012

40 percent

(2) REDEVELOPMENT. Except as provided in s. NR 151.121(5), the redevelopment total suspended solids reduction standard of Table 1., applies to redevelopment.
(3) MAXIMUM EXTENT PRACTICABLE. If the design cannot meet a total suspended solids reduction performance standard of sub. (1), Table 1., the storm water management plan shall include a written, site-specific explanation of why the total suspended solids reduction performance standard cannot be met and why the total suspended solids load will be reduced only to the maximum extent practicable. The department may not require any person to exceed the applicable total suspended solids reduction performance standard to meet the requirements of maximum extent practicable.

Note: Pollutant loading models such as DETPOND, SLAMM, P8, or equivalent methodology may be used to evaluate the efficiency of the design in reducing total suspended solids. Information on how to access these models is available from the department's storm water management program at dnr.wi.gov. Use the most recent version of the model and the rainfall files and other parameter files identified for Wisconsin users unless directed otherwise by the regulatory authority.

(4) OFF-SITE DRAINAGE. When designing BMPs, runoff draining to the BMP from off-site shall be taken into account in determining the treatment efficiency of the practice. Any impact on the efficiency shall be compensated for by increasing the size of the BMP accordingly.

Wis. Admin. Code Department of Natural Resources NR 151.122

CR 09-112: cr. Register December 2010 No. 660, eff. 1-1-11.
Amended by, correction in (3) (Note) made under s. 13.92(4) (b) 7, Stats., Register November 2018 No. 755, eff. 12/1/2018