Current through November 25, 2024
Section ATCP 50.88 - Streambank or shoreline protection(1) DEFINITION. In this section, "streambank or shoreline protection" means waterbody-specific treatments used to stabilize and protect the eroding banks of streams or constructed channels, and shorelines of lakes, reservoirs, or estuaries. The practice is designed and installed to provide water quality benefits or control soil erosion including degradation from livestock and may protect fish habitat as an incidental benefit. Streambank or shoreline protection may include any of the following components: (a) Critical area stabilization under s. ATCP 50.69.(b) Diversions under s. ATCP 50.70.(c) Grade stabilization under s. ATCP 50.73.(cg) Livestock fencing under s. ATCP 50.75.(cr) Livestock watering facilities under s. ATCP 50.76.(d) Riparian buffers under s. ATCP 50.83.(e) Roof runoff systems under s. ATCP 50.85.(em) Stream crossing under s. ATCP 50.885.(f) Subsurface drain under s. ATCP 50.90.(g) Underground outlet under s. ATCP 50.92.(h) Wetland development or restoration under s. ATCP 50.98.(2) ELIGIBLE COSTS. A cost-share grant under s. ATCP 50.40 may reimburse any of the following costs related to streambank or shoreline protection:(a) Costs to install new soil bioengineering and structural treatments including rock riprap. Wood chunks, unsorted demolition material, brick, plaster, blacktop, and other materials that may produce leachates may not be used as riprap. A cost-share grant may reimburse costs for rock and timber riprap or lunkers used to establish fish habitat, in combination with the restoration of a riparian buffer and as part of a streambank or shoreline protection scheme, provided that reimbursement for fish habitat does not exceed 25% of the cost-share grant.(b) Costs to shape streambanks or shorelines before installing protective plantings or structures.(c) Costs to establish permanent vegetative cover, or to provide temporary cover until permanent cover is established. This may include costs for mulch, fertilizer, and other necessary materials.(2m) INELIGIBLE COSTS. Except for violations of this chapter or ch. NR 151, a cost-share grant under s. ATCP 50.40 may not reimburse costs related to mitigation or correction of a violation of state or local laws.(3) DESIGN, CONSTRUCTION, AND MAINTENANCE. A cost-share grant under s. ATCP 50.40 may not reimburse costs for streambank or shoreline protection unless all of the following conditions are met: (a) The streambank or shoreline protection complies with all of the following that apply: 1. NRCS conservation practice standard 342 critical area planting (January, 2018).2. NRCS conservation practice standard 382 fence (January, 2014).3. NRCS conservation practice standard 580 streambank and shoreline protection (September, 2021).4. NRCS conservation practice standard 612 tree/shrub establishment (January, 2018).5. NRCS conservation practice standard 561 heavy use area protection (November, 2022).6. NRCS conservation practice standard 326 clearing and snagging (June, 2016).7. NRCS conservation practice standard 395 stream habitat improvement and management (September, 2021).8. NRCS conservation practice standard 582 open channel (September, 2021).9. NRCS conservation practice standard 584 channel bed stabilization (September, 2021).(b) Cost-share recipients shall obtain all required DNR permits before installing any practices. The department may require documentation that permits have been obtained before it makes reimbursements under this chapter.(c) The landowner agrees to maintain the streambank or shoreline protection for 10 years unless the practice is no longer required to prevent the soil and water resource problem for which the practice was installed.Wis. Admin. Code Department of Agriculture, Trade and Consumer Protection ATCP 50.88
CR 01-090: cr. Register September 2002 No. 561, eff. 10-1-02; CR 08-075: am. (3) (a) 1. to 5. Register April 2009 No. 640, eff. 5-1-09; CR 13-016: am. (title), renum. (1) to (1) (intro.), cr. (1) (a) to (h), am. (2) (intro.), r. (2) (a), renum. (2) (b) to (2) (a) and am., renum. (2) (c) to (2) (b), r. (2) (d), renum. (2) (e) to (2) (c), r. (2) (f), cr. (2m), am. (3) (a) 1. to 5., r. and recr. (3) (b), am. (3) (c) Register February 2014 No. 698, eff. 5-1-14.Amended by, CR 14-047: am. (3) (a) 2., 3., 5. Register, Register May 2015 No. 713, eff.6/1/2015Amended by, CR 16-102: am. (3) (a) 5. Register August 2016 No. 728, eff. 9/1/2016Amended by, CR 16-083: am. (3) (a) 1. Register January 2018 No. 745, eff. 2/1/2018Amended by, CR 23-024: cr. (1) (cg), (cr), (em), am. (2) (a), (3) (a) 1. to 5., cr. (3) (a) 6. to 9. Register May 28 No. 821, eff. 6/1/2024