Series 38-04 - Rules For Quarrying And Reclamation
- Section 38-4-1 - General
- Section 38-4-2 - Definitions
- Section 38-4-3 - Classification of Dams
- Section 38-4-4 - Certificate of Approval
- Section 38-4-5 - Application Procedures
- Section 38-4-6 - Plans and Specifications
- Section 38-4-7 - Design Requirements
- Section 38-4-8 - Subsidence Evaluation
- Section 38-4-9 - Breakthrough Potential Evaluation
- Section 38-4-10 - Geotechnical Considerations
- Section 38-4-11 - Structural Considerations
- Section 38-4-12 - Construction or Modification of a Dam
- Section 38-4-13 - Blasting
- Section 38-4-14 - Storm Water Discharge
- Section 38-4-15 - Erosion and Sediment Control
- Section 38-4-16 - Disposal of Construction Wastes
- Section 38-4-17 - Dust Control
- Section 38-4-18 - Construction Quality Control
- Section 38-4-19 - Breaching of a Dam
- Section 38-4-20 - Removal of a Dam
- Section 38-4-21 - Abandonment of a Dam
- Section 38-4-22 - Reduction of Dam Height to less than Jurisdiction
- Section 38-4-23 - Enlargement of a Structure to Jurisdiction
- Section 38-4-24 - Sale or Transfer of Dam
- Section 38-4-25 - Operation and Maintenance
- Section 38-4-26 - Inspection, Reporting and Certification Requirements
- Section 38-4-27 - Completion of Construction
- Section 38-4-28 - Inspection of Completed Dams
- Section 38-4-29 - Inspection of Dams With Serious Problems
- Section 38-4-30 - Reporting Requirements
- Section 38-4-31 - Inspection and Certification Requirements
- Section 38-4-32 - Monitoring Plans
- Section 38-4-33 - Emergency Warning Plans
- Section 38-4-34 - Emergency Procedures
- Section 38-4-35 - Inspection and Enforcement
- Section 38-4-36 - Application Fee for Certificate of Approval of a Dam