The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance.
EXCEPTION: | Projects determined to be unsafe. |
Demolition. The process of razing, relocating, or removing an existing building or structure, or a portion thereof.
Divert, diverted, or diversion. The reuse, recycling, or beneficial use of construction and demolition materials.
Recycling. The process of transforming or remanufacturing waste materials into useable or marketable materials for use other than landfill disposal or incineration.
Reuse. The return of a material into the economic stream for use.
Salvage. The recovery of construction and demolition building material and components from a building or site in order to increase the reuse or repurpose potential of these materials and decrease the amount of material being sent to the landfill. Salvaged material may be sold, donated, or reused on site.
EXCEPTION: | Projects that include only new construction. |
Wash. Admin. Code § 51-51-60108