C407.1 Scope. This section establishes criteria for compliance using total building performance. All systems and loads shall be included in determining the total building performance including, but not limited to: Heating systems, cooling systems, service water heating, fan systems, lighting power, receptacle loads and process loads.
EXCEPTION | Energy used to recharge or refuel vehicles that are used for on-road and off-site transportation purposes |
Wash. Admin. Code § 51-11C-40701
Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. 13-04-056, § 51-11C-40701, filed 2/1/13, effective 7/1/13.