When funds are available projects may be awarded by the board based on cost savings for the city, installation efficiency, or energy savings. Availability of other funding sources or rebates may also be considered.
Wash. Admin. Code § 479-10-440
When funds are available projects may be awarded by the board based on cost savings for the city, installation efficiency, or energy savings. Availability of other funding sources or rebates may also be considered.
Wash. Admin. Code § 479-10-440