Wash. Admin. Code § 296-17A-0214

Current through Register Vol. 24-23, December 1, 2024
Section 296-17A-0214 - Classification 0214
0214-00Concrete paving and repaving: Highways, streets, or roadways, N.O.C.

Applies to:

Businesses engaged in concrete paving and repaving of highways, streets, or roadways including approaches and bridges.

Paving and repaving begins after the road's right of way has been cleared and excavated and its subbase is level and compressed.

Work includes, but is not limited to:

* Laying of crushed stone and grading or rolling the fill to level and compress;

* Placement of reinforcing steel or expansion joints;

* Set-up and tear down of forms;

* Pouring the concrete;

* Rolling and other finish work;

* Placing manholes, drainage grates, poles, and posts;

* Repairing damaged concrete;

* Exposing underground pipes and utilities;

* Constructing curbs, gutters, sidewalks, median walls, and retaining walls when performed as part of the project;

* Cutting, drilling, sawing, or scraping concrete.

Equipment includes, but is not limited to:

* Dump trucks;

* Graders;

* Paving machinery;

* Rollers;

* Scrapers;

* Water trucks.

Exclusions:

* Worker hours clearing right of ways, establishing grades, and preparing the subbases are reported separately in classification 0101.

* Worker hours doing asphalt paving, surfacing/resurfacing are reported separately in the classification applicable to the work being performed.

* Worker hours doing concrete flatwork not in connection with highway, street, or roadway projects are reported separately in classification 0217.

* Worker hours doing installation of guardrails, lighting standards, and striping are reported separately in classification 0219.

* Worker hours constructing covered or multilevel, public or commercial parking garages are reported separately in classification 0518.

0214-01Concrete curbs, gutters, and sidewalks: Construction and repair in connection with highways, streets, or roadways

Applies to:

Businesses engaged in the construction or repair of concrete curbs, gutters, and sidewalks in connection with highways, streets, or roadways including approaches and bridges.

Construction or repair of concrete curbs, gutters, and sidewalks begins after the roadbed or roadside grade has already been established and the subsurface or subbase has been prepared.

Work includes, but is not limited to:

* Constructing concrete curbs, gutters, or sidewalks;

* Placing reinforcing steel or expansion joints;

* Pouring and finishing of concrete;

* Setting up and tearing down of forms;

* Repaving;

* Placing manholes, drainage grates, poles, and posts;

* Repairing damaged concrete;

* Exposing underground pipes and utilities;

* Cutting, drilling, sawing, or scraping concrete.

Exclusions:

* Worker hours clearing right of ways, establishing grades, and preparing the subbases are reported separately in classification 0101.

* Worker hours doing asphalt paving, surfacing/resurfacing are reported separately in the classification applicable to the work being performed.

* Worker hours doing concrete flatwork not in connection with highway, street, or roadway projects are reported separately in classification 0217.

* Worker hours doing installation of guardrails, lighting standards, and striping are reported separately in classification 0219.

* Worker hours constructing covered or multilevel, public or commercial parking garages are reported separately in classification 0518.

0214-02Concrete median walls and retaining walls: Construction and repair in connection with highways, streets, or roadways

Applies to:

Businesses engaged in the construction or repair of concrete median (divider) walls and retaining walls in connection with highway, street, or roadway projects including approaches and overpasses.

Construction or repair of concrete median (divider) walls and retaining walls begins after the roadbed or roadside grade has already been established and the subsurface or subbase has been prepared.

Work includes, but is not limited to:

* Placing reinforcing steel or expansion joints;

* Pouring and finishing of concrete to form median or divider walls, median strips, or retaining walls alongside the roadway;

* Setting up and tearing down of forms;

* Repaving;

* Placing manholes, drainage grates, poles, and posts;

* Repairing damaged concrete;

* Exposing underground pipes and utilities;

* Cutting, drilling, sawing, or scraping concrete.

Exclusions:

* Worker hours clearing right of ways, establishing grades, and preparing the subbases are reported separately in classification 0101.

* Worker hours doing asphalt paving, surfacing/resurfacing are reported separately in the classification applicable to the work being performed.

* Worker hours doing concrete flatwork not in connection with highway, street, or roadway projects are reported separately in classification 0217.

* Worker hours doing installation of guardrails, lighting standards, and striping are reported separately in classification 0219.

* Worker hours constructing covered or multilevel, public or commercial parking garages are reported separately in classification 0518.

0214-03Concrete sawing, drilling, and cutting: In connection with highways, streets, or roadways

Applies to:

Businesses engaged in concrete sawing, drilling, and cutting in connection with concrete highway, street, or roadway projects including concrete curbs, gutters, sidewalks, median walls, and retaining walls.

Concrete sawing, drilling, and cutting occur on new or existing roadway and related projects.

Work includes, but is not limited to:

* Cutting, drilling, sawing, and scraping concrete;

* Exposing underground utility lines and systems;

* Placing manholes, drainage gates, poles, and posts;

* Repairing damaged concrete.

Exclusions:

* Worker hours clearing right of ways, establishing grades, and preparing the subbases are reported separately in classification 0101.

* Worker hours doing asphalt paving, surfacing/resurfacing are reported separately in the classification applicable to the work being performed.

* Worker hours doing concrete flatwork not in connection with highway, street, or roadway projects are reported separately in classification 0217.

* Worker hours doing installation of guardrails, lighting standards, and striping are reported separately in classification 0219.

* Worker hours constructing covered or multilevel, public or commercial parking garages are reported separately in classification 0518.

Wash. Admin. Code § 296-17A-0214

Amended by WSR 16-14-085, Filed 7/5/2016, effective 1/1/2017
Amended by WSR 23-23-155, Filed 11/21/2023, effective 1/1/2024

07-01-014, recodified as § 296-17A-0214, filed 12/8/06, effective 12/8/06. Statutory Authority: RCW 51.16.035. 98-18-042, § 296-17-50912, filed 8/28/98, effective 10/1/98; 96-12-039, § 296-17-50912, filed 5/31/96, effective 7/1/96.