Wash. Admin. Code § 296-150T-0230

Current through Register Vol. 24-23, December 1, 2024
Section 296-150T-0230 - What are the insignia application requirements?
(1) If you are requesting insignia for units that you intend to manufacture under a new design plan, your completed application must include:
(a) A completed design plan approval request form;
(b) One complete set of design plans, specifications, engineering analysis if required, test procedures and results if required, plus one additional set for each manufacturing location where the design plan will be used;
(c) If required, at least one set of design plans must have an original wet stamp from a professional engineer or architect licensed in Washington state. We will retain the set with the original wet stamp; and
(d) A one-time initial filing fee, the design plan fee (if we approve your design plan) and the fee for each insignia. (See WAC 296-150T-3000.)
(2) If you are requesting insignia under an approved design plan, your completed application must include:
(a) A completed application for insignia form; and
(b) The fee for each insignia requested. (See WAC 296-150T-3000.)

Wash. Admin. Code § 296-150T-0230

Statutory Authority: RCW 43.22.480. 99-12-079, § 296-150T-0230, filed 5/28/99, effective 6/28/99.