Commercial Coach - Master Design Plan:
Commercial Coach - One-Year Design Plan:
Note: | The state building code is on a three-year code cycle which coincides with the state building code council amendment cycle. The National Electrical Code (NEC) cycle, however, does not coincide with the other code cycles. |
Wash. Admin. Code § 296-150C-0410
Statutory Authority: RCW 43.22.480. 00-01-187, § 296-150C-0410, filed 12/22/99, effective 2/8/00. Statutory Authority: Chapter 43.22 RCW. 98-14-078, § 296-150C-0410, filed 6/30/98, effective 7/31/98. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, § 296-150C-0410, filed 10/23/96, effective 11/25/96.