Wash. Admin. Code § 173-509-030

Current through Register Vol. 24-23, December 1, 2024
Section 173-509-030 - Establishment of instream flows
(1) Instream flows are established for stream management units with monitoring to take place at certain control stations as follows:

STREAM MANAGEMENT UNIT INFORMATION

Control Station No.

Stream Management

Unit Name

Control Station

by River Mile and

Section, Township

and Range

Affected Stream

Reach Including

Tributaries

12.1130.00

Green River near Auburn, WA

32.0

17-21-5

From influence of mean annual high tide at low instream flow levels (approximately River Mile 11.0) to USGS Gage #12.1067.000

12.1067.00

Green River near Palmer, WA

60.4

13-21-7

From USGS Gage #12.1067.000 to headwaters.

The Palmer gage will be used to condition future water rights upstream from that gage. The Auburn gage will be used to condition future water right appropriations downstream from the Palmer gage. If it becomes necessary to change a control station location to improve measurement accuracy or management capability, the department shall do so under provisions in WAC 173-500-060(6).

(2) Instream flows established for the stream management units in WAC 173-509-030(1) are as follows:

INSTREAM FLOWS FOR FUTURE WATER RIGHTS IN THE

GREEN-DUWAMISH RIVER BASIN

(in Cubic Feet per Second)

Month

Day

12,1130.00

Normal Year

Green River

Near Auburn

12,1067.00

Normal Year

Green River

Near Palmer

12.1067.00

Critical Year

Green River

Near Palmer

Jan.

1

650

300

300

15

650

300

300

Feb.

1

650

300

300

15

650

300

300

Mar.

1

650

300

300

15

650

300

300

Apr.

1

650

300

300

15

650

300

300

May

1

650

300

300

15

650

300

300

June

1

650

300

300

15

650

300

210

July

1

550

300

150

15

300

150

150

Aug.

1

300

150

150

15

300

150

150

Sept.

1

300

150

150

15

300

150

150

Oct.

1

300

190

150

15

350

240

150

Nov.

1

550

300

190

15

550

300

240

Dec.

1

650

300

300

15

650

300

300

(a) Future water right holders subject to regulation by the Palmer gage will not be allowed to continue diversions when flows fall below the normal year instream flows at the Palmer gage unless a critical condition is declared by the director. The director, or his designee, may authorize, in consultation with the state departments of fisheries and wildlife, a reduction in instream flows during a critical condition period. At no time will diversions subject to regulation by the Palmer gage be continued when flows fall below the critical year instream flows at Palmer. At no time will diversions subject to regulation by the Auburn gage be continued when flows fall below the normal year instream flows at Auburn. When a declaration of overriding considerations of public interest is made by the director, these requirements may be modified or waived. A declaration of overriding consideration because of drought conditions shall not be made when natural flows equal or exceed the one-in-fifty year low flow condition. The director shall consult with the directors of the state departments of wildlife and fisheries before making a declaration of overriding consideration. Any declaration of critical conditions or overriding considerations of public interest made by the director shall be communicated to all basin resource agencies, water purveyors, and local general purpose governments, and include the reason for such declaration and its expected duration.
(b) The director will consider declaring a critical period when:
(1) In the spring the basin runoff volume forecast of May 1 is not adequate to meet the sum of any rights which the city of Tacoma may have established through historical usage prior to the adoption of this regulation plus the normal year instream flows plus the volume required to replenish the conservation storage.
(2) In the summer and fall the sum of the reservoir inflows extrapolated from current observations plus the volume of water in storage at Howard A. Hanson Dam is not adequate to meet the sum of any rights which the city of Tacoma may have established through historical usage prior to the adoption of this regulation plus the normal year instream flows. Within five days the director will inform the major affected water right holders of the extent of the allowed deviation from the normal year instream flows. Once a deviation from normal year instream flows is allowed, the water resources shall be evaluated at least every seven days to see if additional deviation is warranted. Before allowing deviation from the normal year instream flows, water conservation practices and use of other sources shall be considered.
(c) In addition to other necessary provisions, any diversion of the natural flow, including diversion to storage under future water rights shall cease (or be regulated to the extent necessary) when the flow at the applicable control station falls below (or is less than) the instream flows established by this regulation and made a condition of said future water right. Said future water rights are subject to the rights and authority of the Corps of Engineers to utilize for storage and conservation flows, the natural inflow to the Howard A. Hanson reservoir and to all other prior water right holders' authorized use of natural flows, including any rights that the city of Tacoma may have established through historical usage. The use of stored waters is not to be impaired, limited, or diminished by this regulation.

The department recognizes that from time to time the Corps of Engineers may establish a minimum reservoir level which is necessary to provide conservation flows with a high measure of assurance. When the reservoir falls below this level it may be necessary for the Corps of Engineers to replenish conservation storage. When this occurs, water rights subject to the provisions of this chapter may be temporarily regulated or diminished and the actual stream discharge diminished.

(3) Instream flows, as represented in Figure 1, shall be used for definition of instream flows on those days not specifically identified in WAC 173-509-030(2).

FIGURE 1 - PROPOSED INSTREAM FLOWS FOR FUTURE WATER RIGHTS IN THE

GREEN-DUWAMISH RIVER BASIN

Click to view image

(4) All consumptive water rights hereafter established shall be expressly subject to the instream flows established in WAC 173-509-030(1) through (3). However, nothing in this section shall prohibit the release or diversion of stored water or the use of any water course as a means for its conveyance in accordance with RCW 90.03.030.

Wash. Admin. Code § 173-509-030

Statutory Authority: Chapters 43.21B, 43.27A, 90.22 and 90.54 RCW. 88-13-037 (Order 88-11), § 173-509-030, filed 6/9/88. Statutory Authority: RCW 90.22.020, 90.54.020 and 90.54.040. 80-07-005 (Order DE 79-32), § 173-509-030, filed 6/6/80.