Wash. Admin. Code § 136-60-040

Current through Register Vol. 24-23, December 1, 2024
Section 136-60-040 - Validation of annual updates

All control field updates will be subject to review, approval and acceptance (i.e., "validation") by the county road administration board. This process will involve reviewing the submitted documentation and conducting spot-checks as may be necessary. All such updates which are reviewed, approved and accepted by July 1st of each year will be entered into the master county road log. Noncontrol field updates will be entered into the master county road log file without review. The master county road log as of July 1st of each year will be utilized by the county road administration board for general informational purposes and:

(1) On each odd-numbered year, for computation of motor vehicle fuel tax allocations to the counties;
(2) Annually, for the computation of county arterial preservation program allocations to the counties;
(3) On each odd-numbered year, for computation of rural arterial program allocations to the rural arterial program regions; and
(4) For submittal of freight and goods route information to be included in required federal and state freight planning reports and studies.

Wash. Admin. Code § 136-60-040

Amended by WSR 24-22-084, Filed 10/31/2024, effective 12/1/2024

Statutory Authority: Chapter 36.79 RCW. 03-05-009, § 136-60-040, filed 2/7/03, effective 3/10/03; 99-01-021, § 136-60-040, filed 12/7/98, effective 1/7/99. Statutory Authority: Chapter 36.78 RCW. 86-23-050 (Order 64-P), § 136-60-040, filed 11/19/86.