43 Tex. Admin. Code § 224.25

Current through Reg. 49, No. 50; December 13, 2024
Section 224.25 - Extension of Time
(a) The final order authority may not extend the time for filing a document when a statute or rule specifies the time period by which a document must be filed with the department.
(b) When an act is discretionary or allowed to be done at or within a specified time in accordance with this chapter and Government Code, Chapter 2001, the final order authority, with good cause shown, may:
(1) order the specific period extended if the extension is requested before the expiration of the period previously specified; or
(2) allow the act to be done after the expiration of the specified period, provided good cause is shown for the failure to act.

43 Tex. Admin. Code § 224.25

Adopted by Texas Register, Volume 49, Number 17, April 26, 2024, TexReg 2780, eff. 6/1/2024