30 Tex. Admin. Code § 305.573

Current through Reg. 49, No. 45; November 8, 2024
Section 305.573 - Interim Status and Trial Burn Requirements
(a) For the purpose of determining feasibility of compliance with the performance standards of 40 Code of Federal Regulations (CFR) §§266.104 through 266.107 and of determining adequate operating conditions under 40 CFR §266.103 and §335.224 of this title (relating to Additional Interim Status Standards for Burners), applicants owning or operating existing boilers or industrial furnaces operated under the interim status standards of 40 CFR §266.103 and §335.224 of this title (relating to Additional Interim Status Standards for Burners) must either prepare and submit a trial burn plan for approval by the executive director and perform a trial burn in accordance with the approved trial burn plan and in accordance with 40 CFR §270.66 and §305.572 of this title (relating to Permit and Trial Burn Requirements) or submit other information as specified in 40 CFR §270.22(a)(6). The chief clerk shall provide notice of the executive director's intention to approve the trial burn, in accordance with the timing and distribution requirements of § 305.572(b) of this title (relating to Determining Feasibility of Compliance and Adequate Operating Conditions). The contents of the notice must include: the name and telephone number of a contact person at the facility; the name and telephone number of a contact office at the permitting agency; the location where the trial burn plan and any supporting documents can be reviewed and copied; and a schedule of the activities that are required prior to permit issuance, including the anticipated time schedule for approval of the plan and the time period during which the trial burn would be conducted. Applicants who submit a trial burn plan and receive approval before submission of the part B permit application must complete the trial burn and submit the results specified in 40 CFR §270.66(f) with the Part B permit application. If completion of this process conflicts with the date set for submission of the Part B application, the applicant must contact the executive director to establish a later date for submission of the Part B application or the trial burn results. If the applicant submits a trial burn for approval by the executive director with Part B of the permit application, the approved trial burn must be conducted and the results submitted within a time period prior to permit issuance to be specified by the executive director.
(b) Owners and operators who have obtained approval of trial burn plans pursuant to 40 CFR §270.66 prior to the effective date of this section may request executive director approval of the trial burn plan and the executive director may approve the trial burn plan, whether or not the trial burn has been conducted. If the executive director does not approve the trial burn plan, then the owner or operator must prepare and submit a trial burn plan and receive approval from the executive director, and then perform a trial burn in accordance with the approved trial burn plan and in accordance with 40 CFR §270.66 and §305.572 of this title (relating to Permit and Trial Burn Requirements) or submit other information as specified in 40 CFR §270.22(a)(6).

30 Tex. Admin. Code § 305.573

The provisions of this §305.573 adopted to be effective July 29, 1992, 17 TexReg 5016; amended to be effective August 8, 1999, 24 TexReg 5869