30 Tex. Admin. Code § 305.69

Current through Reg. 49, No. 49; December 6, 2024
Section 305.69 - Solid Waste Permit Modification at the Request of the Permittee
(a) Applicability. This section applies only to modifications to industrial and hazardous solid waste permits. Modifications to municipal solid waste permits are covered in § 305.70 of this title (relating to Municipal Solid Waste Permit and Registration Modifications).
(b) Class I modifications of solid waste permits.
(1) Except as provided in paragraph (2) of this subsection, the permittee may put into effect Class 1 modifications listed in Appendix I of subsection (k) of this section under the following conditions:
(A) the permittee must notify the executive director concerning the modification by certified mail or other means that establish proof of delivery within seven calendar days after the change is put into effect. This notification must specify the changes being made to permit conditions or supporting documents referenced by the permit and must explain why they are necessary. Along with the notification, the permittee must provide the applicable information in the form and manner specified in § 1.5(d) of this title (relating to Records of the Agency), §§305.41 - 305.45 and 305.47 - 305.53 of this title (relating to Applicability; Application Required; Who Applies; Signatories to Applications; Contents of Application for Permit; Retention of Application Data; Additional Contents of Applications for Wastewater Discharge Permits; Additional Contents of Application for an Injection Well Permit; Additional Requirements for an Application for a Hazardous or Industrial Solid Waste Permit and for a Post-Closure Order; Revision of Applications for Hazardous Waste Permits; Waste Containing Radioactive Materials; and Application Fee), Subchapter I of this chapter (relating to Hazardous Waste Incinerator Permits), and Subchapter J of this chapter (relating to Permits for Land Treatment Demonstrations Using Field Tests or Laboratory Analyses);
(B) the permittee must send notice of the modification request by first-class mail to all persons listed in § 39.413 of this title (relating to Mailed Notice). This notification must be made within 90 calendar days after the change is put into effect. For the Class 1 modifications that require prior executive director approval, the notification must be made within 90 calendar days after the executive director approves the request; and
(C) any person may request the executive director to review, and the executive director may for cause reject, any Class 1 modification. The executive director must inform the permittee by certified mail that a Class 1 modification has been rejected, explaining the reasons for the rejection. If a Class 1 modification has been rejected, the permittee must comply with the original permit conditions.
(2) Class 1 permit modifications identified in Appendix I of subsection (k) of this section by a superscript 1 may be made only with the prior written approval of the executive director.
(3) For a Class 1 permit modification, the permittee may elect to follow the procedures in subsection (c) of this section for Class 2 modifications instead of the Class 1 procedures. The permittee must inform the executive director of this decision in the notification required in subsection (c)(1) of this section.
(c) Class 2 modifications of solid waste permits.
(1) For Class 2 modifications, which are listed in Appendix I of subsection (k) of this section, the permittee must submit a modification request to the executive director that:
(A) describes the exact change to be made to the permit conditions and supporting documents referenced by the permit;
(B) identifies the modification as a Class 2 modification;
(C) explains why the modification is needed; and
(D) provides the applicable information in the form and manner specified in § 1.5(d) of this title and §§305.41 - 305.45 and 305.47 - 305.53 of this title;
(2) The permittee must send a notice of the modification request by first-class mail to all persons listed in § 39.413 of this title and must cause this notice to be published in a major local newspaper of general circulation. This notice must be mailed and published within seven days before or after the date of submission of the modification request, and the permittee must provide to the executive director evidence of the mailing and publication. The notice must include:
(A) announcement of a 60-day comment period, in accordance with paragraph (5) of this subsection, and the name and address of an agency contact to whom comments must be sent;
(B) announcement of the date, time, and place for a public meeting to be held in accordance with paragraph (4) of this subsection;
(C) name and telephone number of the permittee's contact person;
(D) name and telephone number of an agency contact person;
(E) location where copies of the modification request and any supporting documents can be viewed and copied; and
(F) the following statement: "The permittee's compliance history during the life of the permit being modified is available from the agency contact person."
(3) The permittee must place a copy of the permit modification request and supporting documents in a location accessible to the public in the vicinity of the permitted facility.
(4) The permittee must hold a public meeting no earlier than 15 days after the publication of the notice required in paragraph (2) of this subsection and no later than 15 days before the close of the 60-day comment period. The meeting must be held to the extent practicable in the vicinity of the permitted facility.
(5) The public shall be provided at least 60 days to comment on the modification request. The comment period will begin on the date the permittee publishes the notice in the local newspaper. Comments should be submitted to the agency contact identified in the public notice.
(6) No later than 90 days after receipt of the modification request, subparagraphs (A), (B), (C), (D), or (E) of this paragraph must be met, subject to § 50.133 of this title (relating to Executive Director Action on Application), as follows:
(A) the executive director or the commission must approve the modification request, with or without changes, and modify the permit accordingly;
(B) the commission must deny the request;
(C) the commission or the executive director must determine that the modification request must follow the procedures in subsection (d) of this section for Class 3 modifications for either of the following reasons:
(i) there is significant public concern about the proposed modification; or
(ii) the complex nature of the change requires the more extensive procedures of a Class 3 modification; or
(D) the commission must approve the modification request, with or without changes, as a temporary authorization having a term of up to 180 days, in accordance with the following public notice requirements:
(i) notice of a hearing on the temporary authorization shall be given not later than the 20th day before the hearing on the authorization; and
(ii) this notice of hearing shall provide that an affected person may request an evidentiary hearing on issuance of the temporary authorization; or
(E) the executive director must notify the permittee that the executive director or the commission will decide on the request within the next 30 days.
(7) If the executive director notifies the permittee of a 30-day extension for a decision, then no later than 120 days after receipt of the modification request, subparagraphs (A), (B), (C), or (D) of this paragraph must be met, subject to § 50.133 of this title, as follows:
(A) the executive director or the commission must approve the modification request, with or without changes, and modify the permit accordingly;
(B) the commission must deny the request;
(C) the commission or the executive director must determine that the modification request must follow the procedures in subsection (d) of this section for Class 3 modifications for either of the following reasons:
(i) there is significant public concern about the proposed modification; or
(ii) the complex nature of the change requires the more extensive procedures of a Class 3 modification; or
(D) the commission must approve the modification request, with or without changes, as a temporary authorization having a term of up to 180 days, in accordance with the following public notice requirements:
(i) notice of a hearing on the temporary authorization shall be given not later than the 20th day before the hearing on the authorization; and
(ii) this notice of hearing shall provide that an affected person may request an evidentiary hearing on issuance of the temporary authorization.
(8) If the executive director or the commission fails to make one of the decisions specified in paragraph (7) of this subsection by the 120th day after receipt of the modification request, the permittee is automatically authorized to conduct the activities described in the modification request for up to 180 days, without formal agency action. The authorized activities must be conducted as described in the permit modification request and must be in compliance with all appropriate standards of Chapter 335, Subchapter E of this title (relating to Interim Standards for Owners and Operators of Hazardous Waste Treatment, Storage, or Disposal Facilities). If the commission approves, with or without changes, or denies any modification request during the term of the temporary authorization issued pursuant to paragraph (6) or (7) of this subsection, such action cancels the temporary authorization. The commission is the sole authority for approving or denying the modification request during the term of the temporary authorization. If the executive director or the commission approves, with or without changes, or if the commission denies the modification request during the term of the automatic authorization provided for in this paragraph, such action cancels the automatic authorization.
(9) In the case of an automatic authorization under paragraph (8) of this subsection, or a temporary authorization under paragraph (6)(D) or (7)(D) of this subsection, if the executive director or the commission has not made a final approval or denial of the modification request by the date 50 days prior to the end of the temporary or automatic authorization, the permittee must within seven days of that time send a notification to all persons listed in § 39.413 of this title, and make a reasonable effort to notify other persons who submitted written comments on the modification request, that:
(A) the permittee has been authorized temporarily to conduct the activities described in the permit modification request; and
(B) unless the executive director or the commission acts to give final approval or denial of the request by the end of the authorization period, the permittee will receive authorization to conduct such activities for the life of the permit.
(10) If the owner/operator fails to notify the public by the date specified in paragraph (9) of this subsection, the effective date of the permanent authorization will be deferred until 50 days after the owner/operator notifies the public.
(11) Except as provided in paragraph (13) of this subsection, if the executive director or the commission does not finally approve or deny a modification request before the end of the automatic or temporary authorization period or reclassify the modification as Class 3 modification, the permittee is authorized to conduct the activities described in the permit modification request for the life of the permit unless amended or modified later under § 305.62 of this title (relating to Amendments) or this section. The activities authorized under this paragraph must be conducted as described in the permit modification request and must be in compliance with all appropriate standards of Chapter 335, Subchapter E of this title.
(12) In the processing of each Class 2 modification request which is subsequently approved or denied by the executive director or the commission in accordance with paragraph (6) or (7) of this subsection, or each Class 2 modification request for which a temporary authorization is issued in accordance with subsection (f) of this section or a reclassification to a Class 3 modification is made in accordance with paragraph (6)(C) or (7)(C) of this subsection, the executive director must consider all written comments submitted to the agency during the public comment period and must respond in writing to all significant comments.
(13) With the written consent of the permittee, the executive director may extend indefinitely or for a specified period the time periods for final approval or denial of a Class 2 modification request or for reclassifying a modification as Class 3.
(14) The commission or the executive director may change the terms of, and the commission may deny a Class 2 permit modification request under paragraphs (6) - (8) of this subsection for any of the following reasons:
(A) the modification request is incomplete;
(B) the requested modification does not comply with the appropriate requirements of Chapter 335, Subchapter F of this title (relating to Permitting Standards for Owners and Operators of Hazardous Waste Treatment, Storage, or Disposal Facilities) or other applicable requirements; or
(C) the conditions of the modification fail to protect human health and the environment.
(15) The permittee may perform any construction associated with a Class 2 permit modification request beginning 60 days after the submission of the request unless the executive director establishes a later date for commencing construction and informs the permittee in writing before the 60th day.
(d) Class 3 modifications of solid waste permits.
(1) For Class 3 modifications listed in Appendix I of subsection (k) of this section, the permittee must submit a modification request to the executive director that:
(A) describes the exact change to be made to the permit conditions and supporting documents referenced by the permit;
(B) identifies that the modification is a Class 3 modification;
(C) explains why the modification is needed; and
(D) provides the applicable information in the form and manner specified in § 1.5(d) of this title and §§305.41 - 305.45 and 305.47 - 305.53 of this title; and Subchapter Q of this chapter (relating to Permits for Boilers and Industrial Furnaces Burning Hazardous Waste).
(2) The permittee must send a notice of the modification request by first-class mail to all persons listed in § 39.413 of this title and must cause this notice to be published in a major local newspaper of general circulation. This notice must be mailed and published within seven days before or after the date of submission of the modification request and evidence of the mailing and publication of the notice shall be provided to the executive director. The notice shall include the following:
(A) all information required by § 39.411 of this title (relating to Text of Public Notice);
(B) announcement of a 60-day comment period, and the name and address of an agency contact person to whom comments must be sent;
(C) announcement of the date, time, and place for a public meeting on the modification request, to be held in accordance with paragraph (4) of this subsection;
(D) name and telephone number of the permittee's contact person;
(E) name and telephone number of an agency contact person;
(F) identification of the location where copies of the modification request and any supporting documents can be viewed and copied; and
(G) the following statement: "The permittee's compliance history during the life of the permit being modified is available from the agency contact person."
(3) The permittee must place a copy of the permit modification request and supporting documents in a location accessible to the public in the vicinity of the permitted facility.
(4) The permittee must hold a public meeting no earlier than 15 days after the publication of the notice required in paragraph (2) of this subsection and no later than 15 days before the close of the 60-day comment period. The meeting must be held to the extent practicable in the vicinity of the permitted facility.
(5) The public shall be provided at least 60 days to comment on the modification request. The comment period will begin on the date the permittee publishes the notice in the local newspaper. Comments should be submitted to the agency contact person identified in the public notice.
(6) After the conclusion of the 60-day comment period, the permit modification request shall be granted or denied in accordance with the applicable requirements of Chapter 39 of this title (relating to Public Notice), Chapter 50 of this title (relating to Action on Applications and Other Authorizations), and Chapter 55 of this title (relating to Requests for Reconsideration and Contested Case Hearings; Public Comment). When a permit is modified, only the conditions subject to modification are reopened.
(7) Except as otherwise required by Chapter 39 of this title, the notice requirements in this section do not apply to Class 3 modification applications for industrial or hazardous waste facility permits that are declared administratively complete on or after September 1, 1999.
(e) Other modifications.
(1) In the case of modifications not explicitly listed in Appendix I of subsection (k) of this section, the permittee may submit a Class 3 modification request to the agency, or the permittee may request a determination by the executive director that the modification should be reviewed and approved as a Class 1 or Class 2 modification. If the permittee requests that the modification be classified as a Class 1 or Class 2 modification, the permittee must provide the agency with the necessary information to support the requested classification.
(2) The executive director shall make the determination described in paragraph (1) of this subsection as promptly as practicable. In determining the appropriate class for a specific modification, the executive director shall consider the similarity of the modification to other modifications codified in Appendix I of subsection (k) of this section and the following criteria.
(A) Class 1 modifications apply to minor changes that keep the permit current with routine changes to the facility or its operation. These changes do not substantially alter the permit conditions or reduce the capacity of the facility to protect human health or the environment. In the case of Class 1 modifications, the executive director may require prior approval;
(B) Class 2 modifications apply to changes that are necessary to enable a permittee to respond, in a timely manner, to:
(i) common variations in the types and quantities of the wastes managed under the facility permit;
(ii) technological advancements; and
(iii) changes necessary to comply with new regulations, where these changes can be implemented without substantially changing design specifications or management practices in the permit; and
(C) Class 3 modifications reflect a substantial alteration of the facility or its operations.
(f) Temporary authorizations.
(1) Upon request of the permittee, the commission may grant the permittee a temporary authorization having a term of up to 180 days, in accordance with this subsection, and in accordance with the following public notice requirements:
(A) notice of a hearing on the temporary authorization shall be given not later than the 20th day before the hearing on the authorization; and
(B) this notice of hearing shall provide that an affected person may request an evidentiary hearing on issuance of the temporary authorization.
(2) The permittee may request a temporary authorization for:
(A) any Class 2 modification meeting the criteria in paragraph (5)(B) of this subsection; and
(B) any Class 3 modification that meets the criteria in paragraph (5)(B)(i) or (ii) of this subsection, or that meets any of the criteria in paragraph (5)(B)(iii) - (v) of this subsection and provides improved management or treatment of a hazardous waste already listed in the facility permit.
(3) The temporary authorization request must include:
(A) a specific description of the activities to be conducted under the temporary authorization;
(B) an explanation of why the temporary authorization is necessary and reasonably unavoidable; and
(C) sufficient information to ensure compliance with the applicable standards of Chapter 335, Subchapter F of this title and 40 Code of Federal Regulations (CFR) Part 264.
(4) The permittee must send a notice about the temporary authorization request by first-class mail to all persons listed in § 39.413 of this title. This notification must be made within seven days of submission of the authorization request.
(5) The commission shall approve or deny the temporary authorization as quickly as practicable. To issue a temporary authorization, the commission must find:
(A) the authorized activities are in compliance with the applicable standards of Chapter 335, Subchapter F of this title and 40 CFR Part 264; and
(B) the temporary authorization is necessary to achieve one of the following objectives before action is likely to be taken on a modification request:
(i) to facilitate timely implementation of closure or corrective action activities;
(ii) to allow treatment or storage in tanks, containers, or containment buildings, of restricted wastes in accordance with Chapter 335, Subchapter O of this title (relating to Land Disposal Restrictions), 40 CFR Part 268, or Section 3004 of the Resource Conservation and Recovery Act (RCRA), 42 United States Code, § 6924;
(iii) to prevent disruption of ongoing waste management activities;
(iv) to enable the permittee to respond to sudden changes in the types or quantities of the wastes managed under the facility permit; or
(v) to facilitate other changes to protect human health and the environment.
(6) A temporary authorization may be reissued for one additional term of up to 180 days provided that the permittee has requested a Class 2 or 3 permit modification for the activity covered in the temporary authorization, and:
(A) the reissued temporary authorization constitutes the commission's decision on a Class 2 permit modification in accordance with subsection (c)(6)(D) or (7)(D) of this section; or
(B) the commission determines that the reissued temporary authorization involving a Class 3 permit modification request is warranted to allow the authorized activities to continue while the modification procedures of subsection (d) of this section are conducted.
(g) Public notice and appeals of permit modification decisions.
(1) The commission shall notify all persons listed in § 39.413 of this title within ten working days of any decision under this section to grant or deny a Class 2 or 3 permit modification request. The commission shall also notify such persons within ten working days after an automatic authorization for a Class 2 modification goes into effect under subsection (c)(8) or (11) of this section.
(2) The executive director's or the commission's decision to grant or deny a Class 3 permit modification request under this section may be appealed under the appropriate procedures set forth in the commission's rules and in the Administrative Procedure Act, Texas Government Code, Chapter 2001.
(h) Newly regulated wastes and units.
(1) The permittee is authorized to continue to manage wastes listed or identified as hazardous under 40 CFR Part 261, or to continue to manage hazardous waste in units newly regulated as hazardous waste management units if:
(A) the unit was in existence as a hazardous waste facility unit with respect to the newly listed or characteristic waste or newly regulated waste management unit on the effective date of the final rule listing or identifying the waste or regulating the unit;
(B) the permittee submits a Class 1 modification request on or before the date on which the waste or unit becomes subject to the new requirements;
(C) the permittee is in substantial compliance with the applicable standards of Chapter 335, Subchapter E of this title, Chapter 335, Subchapter H, Divisions 1 through 4 of this title (relating to Standards for the Management of Specific Wastes and Specific Types of Facilities), and 40 CFR Part 265 and Part 266;
(D) the permittee also submits a complete Class 2 or 3 modification request within 180 days after the effective date of the final rule listing or identifying the waste or subjecting the unit to Section 6921 of the Resource Conservation and Recovery Act Subtitle C (Subchapter III Hazardous Waste Management, 42 United States Code, §§ 6921- 6939e ); and
(E) in the case of land disposal units, the permittee certifies that each such unit is in compliance with all applicable 40 CFR Part 265 groundwater monitoring requirements and with Chapter 37 of this title (relating to Financial Assurance) on the date 12 months after the effective date of the final rule identifying or listing the waste as hazardous, or regulating the unit as a hazardous waste management unit. If the owner or operator fails to certify compliance with these requirements, the owner or operator shall lose authority to operate under this section.
(2) New wastes or units added to a facility's permit under this subsection do not constitute expansions for the purpose of the 25% capacity expansion limit for Class 2 modifications.
(i) Combustion facility changes to meet 40 CFR Part 63, Maximum Achievable Control Technology (MACT) standards. The following procedures apply to hazardous waste combustion facility permit modifications requested under L.9. of Appendix I of subsection (k) of this section.
(1) Facility owners or operators must have complied with the Notification of Intent to Comply (NIC) requirements of 40 CFR § 63.1210(b) and (c) that were in effect prior to October 11, 2000, as amended in 40 CFR § 270.42(j) through October 12, 2005 (70 Federal Register 59402), before a permit modification can be requested under this section.
(2) If the executive director does not approve or deny the request within 90 days of receiving it, the request shall be deemed approved. The executive director may, at his or her discretion, extend this 90-day deadline one time for up to 30 days by notifying the facility owner or operator.
(3) Facility owners or operators may request to have specific RCRA operating and emissions limits waived by submitting a Class 1 permit modification request under L.10. in Appendix I of subsection (k) of this section. The facility owner or operator must:
(A) identify the specific RCRA permit operating and emissions limits which are requested to be waived;
(B) provide an explanation of why the changes are necessary to minimize or eliminate conflicts between the RCRA permit and MACT compliance;
(C) discuss how the revised provisions will be sufficiently protective; and
(D) the executive director shall notify the facility owner or operator whether the Class 1 permit modification has been approved or denied. If denied, the executive director shall provide justification for denial.
(4) To request the modification referenced in paragraph (3) of this subsection in conjunction with MACT performance testing where permit limits may only be waived during actual test events and pretesting, as defined under 40 CFR § 63.1207(h)(2)(i) and (ii), for an aggregate time not to exceed 720 hours of operation (renewable at the discretion of the executive director); the owner or operator must:
(A) submit the modification request to the executive director at the same time the test plans are submitted to the executive director; and
(B) the executive director may elect to approve or deny the request contingent upon approval of the test plans.
(j) Military hazardous waste munitions storage, processing, and disposal. The permittee is authorized to continue to accept waste military munitions regardless of any permit conditions barring the permittee from accepting off-site wastes, if:
(1) the facility is in existence as a hazardous waste facility, and the facility is already permitted to handle waste military munitions, on the date when waste military munitions become subject to hazardous waste regulatory requirements;
(2) on or before the date when waste military munitions become subject to hazardous waste regulatory requirements, the permittee submits a Class 1 modification request to remove or revise the permit provision restricting the receipt of off-site waste munitions; and
(3) the permittee submits a Class 2 modification request within 180 days of the date when the waste military munitions become subject to hazardous waste regulatory requirements.
(k) Appendix I. The following appendix will be used for the purposes of this subchapter which relates to industrial and hazardous solid waste permit modification at the request of the permittee.

Attached Graphic

30 Tex. Admin. Code § 305.69

The provisions of this §305.69 adopted to be effective October 29, 1990, 15 TexReg 6015; amended to be effective July 29, 1992, 17 TexReg 5090; amended to be effective June 7, 1993, 18 TexReg 3290; amended to be effective November 23, 1993, 18 TexReg 8215; amended to be effective February 22, 1994, 19 TexReg 941; amended to be effective November 7, 1994, 19 TexReg 8543; amended to be effective April 17, 1995, 20 TexReg 2392; amended to be effective February 26, 1996, 21 TexReg 1137; amended to be effective August 8, 1999, 24 TexReg 5879;amended to be effective March 21, 2000, 25 TexReg 2368; amended to be effective April 12, 2001, 26 TexReg 2739; amended to be effective November 15, 2001, 26 TexReg 9123; amended to be effective August 16, 2007, 32 TexReg 5003; amended to be effective October 29, 2009, 34 TexReg 7315; amended to be effective February 21, 2013, 38 TexReg 970; Amended by Texas Register, Volume 45, Number 19, May 8, 2020, TexReg 3111, eff. 5/14/2020