30 Tex. Admin. Code § 116.112

Current through Reg. 49, No. 45; November 8, 2024
Section 116.112 - Distance Limitations
(a) For any facility subject to the notice and hearing requirements of Subchapter B, Division 3 of this chapter (relating to Public Notification and Comment Procedures); Chapter 39, Subchapter H or K of this title (relating to Applicability and General Provisions and Public Notice of Air Quality Applications); or Chapter 122, Subchapter D of this title (relating to Public Announcement, Public Notice, Affected State Review, Notice and Comment Hearing, Notice of Proposed Final Action, EPA Review, and Public Petition), the measurement of distances to determine compliance with any location or distance limitation requirement in Texas Health and Safety Code, Chapter 382, shall be taken toward structures that are in use at the time the permit application is filed with the commission, and that are not occupied or used solely by the owner of the facility or the owner of the property upon which the facility is located.
(b) The following facilities must satisfy the following distance criteria.
(1) Lead smelters. New lead smelting plants shall be located at least 3,000 feet from any individual's residence where lead smelting operations have not been conducted before August 31, 1987. This subsection does not apply to:
(A) a modification of a lead smelting plant in operation on or before August 31, 1987;
(B) a new lead smelting plant or modification of a plant with the capacity to produce 200 pounds or less of lead per hour; or
(C) a lead smelting plant that was located more than 3,000 feet from the nearest residence when the plant began operations.
(2) Concrete crushing facilities. A concrete crushing facility must not be operated within 440 yards of any building in use as a single or multi-family residence, school, or place of worship at the time the application for the initial authorization for the operation of that facility at that location is filed with the commission.
(A) The measurement of distances shall be taken from the point on the concrete crushing facility nearest to the residence, school, or place of worship to the point on the building in use as a residence, school, or place of worship that is nearest the concrete crushing facility.
(B) The minimum distance limitation and measurement requirements of this paragraph do not apply to concrete crushing facilities that were authorized to operate at the site as of September 1, 2001.
(C) Unless the facility is located in, or located in a county adjacent to, a county with a population of 2.4 million or more, the minimum distance limitation and measurement requirements of this paragraph do not apply to facilities operated on a site during one period of no more than 180 calendar days that crush concrete resulting from the demolition of a structure on that site for use primarily at that site, and which comply with all applicable conditions stated in commission rules, including operating conditions.
(D) The minimum distance limitation and measurement requirements of this paragraph do not apply to structures occupied or used solely by the owner of the facility or the owner of the property upon which the facility is located.
(c) For applicable distance limitations at hazardous waste management facilities, see § 335.204 of this title (relating to Unsuitable Site Characteristics), as amended and adopted in the August 22, 2003 issue of the Texas Register (28 TexReg 6915), and § 335.205 of this title (relating to Prohibition of Permit Issuance), as amended and adopted in the November 9, 2001 issue of the Texas Register (26 TexReg 9135).

30 Tex. Admin. Code § 116.112

The provisions of this §116.112 adopted to be effective July 8, 1998, 23 TexReg 6973; amended to be effective January 8, 2003, 28 TexReg 240; amended to be effective February 4, 2004, 29 TexReg 1010; Amended by Texas Register, Volume 45, Number 19, May 8, 2020, TexReg 3093, eff. 5/14/2020