Current through Reg. 49, No. 45; November 8, 2024
Section 25.43 - Provider of Last Resort (POLR)(a) Purpose. This section establishes the requirements for Provider of Last Resort (POLR) service and ensures that it is available to any requesting retail customer and any retail customer who is transferred to another retail electric provider (REP) by the Electric Reliability Council of Texas (ERCOT) because the customer's REP failed to provide service to the customer or failed to meet its obligations to the independent organization.(b) Application. The provisions of this section relating to the selection of REPs providing POLR service apply to all REPs that are serving retail customers in transmission and distribution utility (TDU) service areas. This section does not apply when an electric cooperative or a municipally owned utility (MOU) designates a POLR provider for its certificated service area. However, this section is applicable when an electric cooperative delegates its authority to the commission in accordance with subsection (r) of this section to select a POLR provider for the electric cooperative's service area. All filings made with the commission pursuant to this section, including filings subject to a claim of confidentiality, must be filed with the commission's Filing Clerk in accordance with the commission's Procedural Rules, Chapter 22, Subchapter E, of this title (relating to Pleadings and other Documents).(c) Definitions. The following terms when used in this section have the following meanings, unless the context indicates otherwise:(1) Affiliate--As defined in § 25.107 of this title (relating to Certification of Retail Electric Providers (REPs).(2) Basic firm service--Electric service that is not subject to interruption for economic reasons and that does not include value-added options offered in the competitive market. Basic firm service excludes, among other competitively offered options, emergency or back-up service, and stand-by service. For purposes of this definition, the phrase "interruption for economic reasons" does not mean disconnection for non-payment.(3) Billing cycle--A period bounded by a start date and stop date that REPs and TDUs use to determine when a customer used electric service.(4) Billing month--Generally a calendar accounting period (approximately 30 days) for recording revenue, which may or may not coincide with the period a customer's consumption is recorded through the customer's meter.(5) Business day--As defined by the ERCOT Protocols.(6) Large non-residential customer--A non-residential customer who had a peak demand in the previous 12-month period at or above one megawatt (MW).(7) Large service provider (LSP)--A REP that is designated to provide POLR service pursuant to subsection (j) of this section.(8) Market-based product - A month-to-month product that is either offered to or matches the rate of a product offered to non-POLR customers of the REP for the same TDU territory and customer class. A month-to-month contract may not contain a termination fee or penalty. For purposes of this section, a rate for residential customers that is derived by applying a positive or negative multiplier to the rate described in subsection (m)(2) of this section is not a market-based product.(9) Mass transition--The transfer of customers as represented by ESI IDs from a REP to one or more POLR providers pursuant to a transaction initiated by the independent organization that carries the mass transition (TS) code or other code designated by the independent organization.(10) Medium non-residential customer--A non-residential retail customer who had a peak demand in the previous 12-month period of 50 kilowatt (kW) or greater, but less than 1,000 kW.(11) POLR area--The service area of a TDU in an area where customer choice is in effect.(12) POLR provider--A volunteer retail electric provider (VREP) or LSP that may be required to provide POLR service pursuant to this section.(13) Residential customer--A retail customer classified as residential by the applicable TDU tariff or, in the absence of classification under a tariff, a retail customer who purchases electricity for personal, family, or household purposes.(14) Transitioned customer--A customer as represented by ESI IDs that is served by a POLR provider as a result of a mass transition under this section.(15) Small non-residential customer--A non-residential retail customer who had a peak demand in the previous 12-month period of less than 50 kW.(16) Voluntary retail electric provider (VREP)--A REP that has volunteered to provide POLR service pursuant to subsection (i) of this section.(d) POLR service.(1) There are two types of POLR providers: VREPs and LSPs.(2) For the purpose of POLR service, there are four classes of customers: residential, small non-residential, medium non-residential, and large non-residential.(3) A VREP or LSP may be designated to serve any or all of the four customer classes in a POLR area.(4) A POLR provider must offer a basic, standard retail service package to customers it is designated to serve, which is limited to:(A) Basic firm service; and(B) Call center facilities available for customer inquiries.(5) A POLR provider must, in accordance with § 25.108 of this title (relating to Financial Standards for Retail Electric Providers Regarding the Billing and Collection of Transition Charges), fulfill billing and collection duties for REPs that have defaulted on payments to the servicer of transition bonds or to TDUs.(6) Each LSP's customer billing for residential customers taking POLR service under a rate prescribed by subsection (m)(2) of this section must contain notice to the customer that other competitive products or services may be available from the LSP or another REP. The notice must also include contact information for the LSP, and the Power to Choose website, and must include a notice from the commission in the form of a bill insert or a bill message with the header "An Important Message from the Public Utility Commission Regarding Your Electric Service" addressing why the customer has been transitioned to an LSP, a description of the purpose and nature of POLR service, and explaining that more information on competitive markets can be found at www.powertochoose.org, or toll-free at 1-866-PWR-4-TEX (1-866-797-4839).(e) Standards of service. (1) An LSP designated to serve a class in a given POLR area must serve any eligible customer requesting POLR service or assigned to the LSP pursuant to a mass transition in accordance with the Standard Terms of Service in subsection (f)(1) of this section for the provider customer's class. However, in lieu of providing terms of service to a transitioned customer under subsection (f) of this section and under a rate prescribed by subsection (m)(2) of this section an LSP may at its discretion serve the customer pursuant to a market-based month-to-month product, provided it serves all transitioned customers in the same class and POLR area pursuant to the product.(2) A POLR provider must abide by the applicable customer protection rules as provided for under Subchapter R of this chapter (relating to Customer Protection Rules for Retail Electric Service), except that if there is an inconsistency or conflict between this section and Subchapter R of this chapter, the provisions of this section apply. However, for the medium non-residential customer class, the customer protection rules as provided for under Subchapter R of this chapter do not apply, except for § 25.481 of this title (relating to Unauthorized Charges), §25.485(a) - (b) of this title (relating to Customer Access and Complaint Handling), and § 25.495 of this title (relating to Unauthorized Change of Retail Electric Provider).(3) An LSP that has received commission approval to designate one of its affiliates to provide POLR service on behalf of the LSP pursuant to subsection (k) of this section must retain responsibility for the provision of POLR service by the LSP affiliate and remains liable for violations of applicable laws and commission rules and all financial obligations of the LSP affiliate associated with the provisioning of POLR service on its behalf by the LSP affiliate.(f) Customer information. (1) The Standard Terms of Service prescribed in subparagraphs (A) - (D) of this paragraph apply to POLR service provided by an LSP under a rate prescribed by subsection (m)(2) of this section. (A) Standard Terms of Service, POLR Provider Residential Service: Attached Graphic
(B) Standard Terms of Service, POLR Provider Small Non-Residential Service: Attached Graphic
(C) Standard Terms of Service, POLR Provider Medium Non-Residential Service: Attached Graphic
(D) Standard Terms of Service, POLR Provider Large Non-Residential Service: Attached Graphic
(2) An LSP providing service under a rate prescribed by subsection (m)(2) of this section must provide each new customer the applicable Standard Terms of Service. Such Standard Terms of Service must be updated as required under § 25.475(f) of this title (relating to General Retail Electric Provider Requirements and Information Disclosures to Residential and Small Commercial Customers).(g) General description of POLR service provider selection process. (1) Each REP must provide information to the commission in accordance with subsection (h)(1) of this section. Based on this information, the commission's designated representative will designate REPs that are eligible to serve as POLR providers in areas of the state in which customer choice is in effect, except that the commission will not designate POLR providers in the service areas of MOUs or electric cooperatives unless an electric cooperative has delegated to the commission its authority to designate the POLR provider, in accordance with subsection (r) of this section.(2) POLR providers must serve two-year terms. The initial term for POLR service in areas of the state where retail choice is not in effect as of the effective date of the rule must be set at the time POLR providers are initially selected in such areas.(h) REP eligibility to serve as a POLR provider. In each even-numbered year, the commission will determine the eligibility of certified REPs to serve as POLR providers for a term scheduled to commence in January of the next year.(1) Each REP must provide information to the commission necessary to establish its eligibility to serve as a POLR provider for the next term. A REP must file, by July 10th of each even-numbered year, by service area, information on the classes of customers it provides service to, and for each customer class, the number of ESI IDs the REP serves and the retail sales in megawatt-hours for the annual period ending March 31 of the current year. As part of that filing, a REP may request that the commission designate one of its affiliates to provide POLR service on its behalf pursuant to subsection (k) of this section in the event that the REP is designated as an LSP. The independent organization must provide to the commission the total number of ESI ID and total MWh data for each class. Each REP must also provide information on its technical capability and financial ability to provide service to additional customers in a mass transition. The commission's determination regarding eligibility of a REP to serve as POLR provider under the provisions of this section will not be considered confidential information.(2) Eligibility to be designated as a POLR provider is specific to each POLR area and customer class. A REP is eligible to be designated a POLR provider for a particular customer class in a POLR area, unless:(A) A proceeding to revoke or suspend the REP's certificate is pending at the commission, the REP's certificate has been suspended or revoked by the commission, or the REP's certificate is deemed suspended pursuant to § 25.107 of this title (relating to Certification of Retail Electric Providers (REPs));(B) The sum of the numeric portion of the REP's percentage of ESI IDs served and percentage of retail sales by MWhs in the POLR area, for the particular class, is less than 1.0;(C) The commission does not reasonably expect the REP to be able to meet the criteria set forth in subparagraph (B) of this paragraph during the entirety of the term;(D) On the date of the commencement of the term, the REP or its predecessor will not have served customers in Texas for at least 18 months;(E) The REP does not serve the applicable customer class, or does not have an executed delivery service agreement with the service area TDU;(F) The REP is certificated as an Option 2 REP under § 25.107 of this title;(G) The REP's customers are limited to its own affiliates;(H) A REP files an affidavit stating that it does not serve small or medium non-residential customers, except for the low-usage sites of the REP's large non-residential customers, or commonly owned or franchised affiliates of the REP's large non-residential customers and opts out of eligibility for either, or both of the small or medium non-residential customer classes; or(I) The REP does not meet minimum financial, technical and managerial qualifications established by the commission under § 25.107 of this title.(3) For each term, the commission will publish the names of all REPs eligible to serve as a POLR provider under this section for each customer class in each POLR area and will provide notice to REPs determined to be eligible to serve as a POLR provider. A REP may challenge its eligibility determination within five business days of the notice of eligibility by filing with the commission additional documentation that includes the specific data, the specific calculation, and a specific explanation that clearly illustrate and prove the REP's assertion. Commission staff will verify the additional documentation and, if accurate, reassess the REP's eligibility. Commission staff will notify the REP of any change in eligibility status within 10 business days of the receipt of the additional documentation. A REP may then appeal to the commission through a contested case if the REP does not agree with the staff determination of eligibility. The contested status will not delay the designation of POLR providers.(4) A standard form may be created by the commission for REPs to use in filing information concerning their eligibility to serve as a POLR provider.(5) If ERCOT or a TDU has reason to believe that a REP is no longer capable of performing POLR responsibilities, ERCOT or the TDU must make a filing with the commission detailing the basis for its concerns and must provide a copy of the filing to the REP that is the subject of the filing. If the filing contains confidential information, ERCOT or the TDU must file the confidential information in accordance with § 22.71 of this title (relating to Filing of Pleadings, Documents, and Other Materials). Commission staff will review the filing, and will request that the REP demonstrate that it still meets the qualifications to provide the service. The commission staff may initiate a proceeding with the commission to disqualify the REP from providing POLR service. No ESI IDs will be assigned to a POLR provider after the commission staff initiates a proceeding to disqualify the POLR provider, unless the commission by order confirms the POLR provider's designation.(i) VREP list. Based on the information provided in accordance with this subsection and subsection (h) of this section, the commission will post the names of VREPs on its webpage, including the aggregate customer count offered by VREPs. A REP may submit a request to be a VREP no earlier than June 1, and no later than July 31, of each even-numbered year unless otherwise determined by the executive director. This filing must include a description of the REP's capabilities to serve additional customers as well as the REP's current financial condition in enough detail to demonstrate that the REP is capable of absorbing a mass transition of customers without technically or financially distressing the REP and the specific information set out in this subsection. The commission's determination regarding eligibility of a REP to serve as a VREP, under the provisions of this section, will not be considered confidential information. (1) A VREP must provide to the commission the name of the REP, the appropriate contact person with current contact information, which customer classes the REP is willing to serve within each POLR area, and the number of ESI IDs the REP is willing to serve by customer class and POLR area in each transition event.(2) A REP that has met the eligibility requirements of subsection (h) of this section and provided the additional information set out in this subsection is eligible for designation as a VREP.(3) Commission staff will make an initial determination of the REPs that are to serve as a VREP for each customer class in each POLR area and publish their names. A REP may challenge its eligibility determination within five business days of the notice of eligibility by submitting to commission staff additional evidence of its capability to serve as a VREP. Commission staff will reassess the REP's eligibility and notify the REP of any change in eligibility status within 10 business days of the receipt of the additional documentation. A REP may then appeal to the commission through a contested case if the REP does not agree with the staff determination of eligibility. The contested status will not delay the designation of VREPs.(4) A VREP may file a request at any time to be removed from the VREP list or to modify the number of ESI IDs that it is willing to serve as a VREP. If the request is to increase the number of ESI IDs, it must provide information to demonstrate that it is capable of serving the additional ESI IDs, and the commission staff will make an initial determination, which is subject to an appeal to the commission, in accordance with the timelines specified in paragraph (3) of this subsection. If the request is to decrease the number of ESI IDs, the request must be effective five calendar days after the request is filed with the commission; however, after the request becomes effective the VREP must continue to serve ESI IDs previously acquired through a mass transition event as well as ESI IDs the VREP acquires from a mass transition event that occurs during the five-day notice period. If in a mass transition a VREP is able to acquire more customers than it originally volunteered to serve, the VREP may work with commission staff and ERCOT to increase its designation. Changes approved by commission staff will be communicated to ERCOT and must be implemented for the current allocation if possible.(5) ERCOT or a TDU may challenge a VREP's eligibility. If ERCOT or a TDU has reason to believe that a REP is no longer capable of performing VREP responsibilities, ERCOT or the TDU must make a filing with the commission detailing the basis for its concerns and must provide a copy of the filing to the REP that is the subject of the filing. If the filing contains confidential information, ERCOT or the TDU must file it in accordance with § 25.71 of this title (relating to General Procedures, Requirements and Penalties). Commission staff will review the filing of ERCOT and if commission staff concludes that the REP should no longer provide VREP service, it will request that the REP demonstrate that it still meets the qualifications to provide the service. The commission staff may initiate a proceeding with the commission to disqualify the REP from providing VREP service. No ESI IDs will be assigned to a VREP after the commission staff initiates a proceeding to disqualify the VREP, unless the commission by order confirms the VREP's designation.(j) LSPs. This subsection governs the selection and service of REPs as LSPs. (1) The REPs eligible to serve as LSPs must be determined based on the information provided by REPs in accordance with subsection (h) of this section. However, for new TDU service areas that are transitioned to competition, the transition to competition plan approved by the commission may govern the selection of LSPs to serve as POLR providers.(2) In each POLR area, for each customer class, the commission will designate up to 15 LSPs. The eligible REPs that have the greatest market share based upon retail sales in megawatt-hours, by customer class and POLR area must be designated as LSPs. Commission staff will designate the LSPs by October 15th of each even-numbered year, based upon the data submitted to the commission under subsection (h) of this section. Designation as a VREP does not affect a REP's eligibility to also serve as an LSP.(3) For the purpose of calculating the POLR rate for each customer class in each POLR area, an EFL must be completed by the LSP that has the greatest market share in accordance with paragraph (2) of this subsection. The Electricity Facts Label (EFL) must be supplied to commission staff electronically for placement on the commission webpage by the 10th of each month. Where REP-specific information is required to be inserted in the EFL, the LSP supplying the EFL must note that such information is REP-specific.(4) An LSP serving transitioned residential and small non-residential customers under a rate prescribed by subsection (m)(2) of this section must move such customers to a market-based month-to-month product, with pricing for such product to be effective no later than either the 61st day of service by the LSP or beginning with the customer's next billing cycle date following the 60th day of service by the LSP. For each transition event, all such transitioned customers in the same class and POLR area must be served pursuant to the same product terms, except for those customers specified in subparagraph (B) of this paragraph. (A) The notice required by § 25.475(d) of this title to inform the customers of the change to a market-based month-to-month product may be included with the notice required by subsection (t)(3) of this section or may be provided 14 days in advance of the change. If the §25.475(d) notice is included with the notice required by subsection (t)(3) of this section, the LSP may state that either or both the terms of service document and EFL for the market-based month-to-month product will be provided at a later time, but no later than 14 days before their effective date.(B) The LSP is not required to transfer to a market-based product any transitioned customer who is delinquent in payment of any charges for POLR service to such LSP as of the 60th day of service. If such a customer becomes current in payments to the LSP, the LSP must move the customer to a market-based month-to-month product as described in this paragraph on the next billing cycle that occurs five business days after the customer becomes current. If the LSP does not plan to move customers who are delinquent in payment of any charges for POLR service as of the 60th day of service to a market-based month-to-month product, the LSP must inform the customer of that potential outcome in the notice provided to comply with § 25.475(d) of this title.(5) Upon a request from an LSP and a showing that the LSP will be unable to maintain its financial integrity if additional customers are transferred to it under this section, the commission may relieve an LSP from a transfer of additional customers. The LSP must continue providing continuous service until the commission issues an order relieving it of this responsibility. In the event the requesting LSP is relieved of its responsibility, the commission staff designee will, with 90 days' notice, designate the next eligible REP, if any, as an LSP, based upon the criteria in this subsection.(k) Designation of an LSP affiliate to provide POLR service on behalf of an LSP.(1) An LSP may request the commission designate an LSP affiliate to provide POLR service on behalf of the LSP either with the LSP's filing under subsection (h) of this section or as a separate filing in the current term project. The filing must be made at least 30 days prior to the date when the LSP affiliate is to begin providing POLR service on behalf of the LSP. To be eligible to provide POLR service on behalf of an LSP, the LSP affiliate must be certificated to provide retail electric service; have an executed delivery service agreement with the service area TDU; and meet the requirements of subsection (h)(2) of this section, with the exception of subsection (h)(2)(B), (C), (D), and (E) of this section as related to serving customers in the applicable customer class.(2) The request must include the name and certificate number of the LSP affiliate, information demonstrating the affiliation between the LSP and the LSP affiliate, and a certified agreement from an officer of the LSP affiliate stating that the LSP affiliate agrees to provide POLR service on behalf of the LSP. The request must also include an affidavit from an officer of the LSP stating that the LSP will be responsible and indemnify any affected parties for all financial obligations of the LSP affiliate associated with the provisioning of POLR service on behalf of the LSP in the event that the LSP affiliate defaults or otherwise does not fulfill such financial obligations.(3) Commission staff will make an initial determination of the eligibility of the LSP affiliate to provide POLR service on behalf of an LSP and publish their names. The LSP or LSP affiliate may challenge commission staff's eligibility determination within five business days of the notice of eligibility by submitting to commission staff additional evidence of its capability to provide POLR service on behalf of the LSP. Commission staff will reassess the LSP affiliate's eligibility and notify the LSP and LSP affiliate of any change in eligibility status within 10 business days of the receipt of the additional documentation. If the LSP or LSP affiliate does not agree with staff's determination of eligibility, either or both may then appeal the determination to the commission through a contested case. The LSP must provide POLR service during the pendency of the contested case.(4) ERCOT or a TDU may challenge an LSP affiliate's eligibility to provide POLR service on behalf of an LSP. If ERCOT or a TDU has reason to believe that an LSP affiliate is not eligible or is not performing POLR responsibilities on behalf of an LSP, ERCOT or the TDU must make a filing with the commission detailing the basis for its concerns and must provide a copy of the filing to the LSP and the LSP affiliate that are the subject of the filing. If the filing contains confidential information, ERCOT or the TDU must file it in accordance with § 25.71 of this title (relating to General Procedures, Requirements and Penalties). Commission staff will review the filing and if commission staff concludes that the LSP affiliate should not be allowed to provide POLR service on behalf of the LSP, it will request that the LSP affiliate demonstrate that it has the capability. The commission staff will review the LSP affiliate's filing and may initiate a proceeding with the commission to disqualify the LSP affiliate from providing POLR service. The LSP affiliate may continue providing POLR service to ESI IDs currently receiving the service during the pendency of the proceeding; however, the LSP must immediately assume responsibility to provide service under this section to customers who request POLR service, or are transferred to POLR service through a mass transition, during the pendency of the proceeding.(5) Designation of an affiliate to provide POLR service on behalf of an LSP must not change the number of ESI IDs served or the retail sales in megawatt-hours for the LSP for the reporting period nor does such designation relieve the LSP of its POLR service obligations in the event that the LSP affiliate fails to provide POLR service in accordance with the commission rules.(6) The designated LSP affiliate must provide POLR service and all reports as required by the commission's rules on behalf of the LSP.(7) The methodology used by a designated LSP affiliate to calculate POLR rates must be consistent with the methodology used to calculate LSP POLR rates in subsection (m) of this section.(8) If an LSP affiliate designated to provide POLR service on behalf of an LSP cannot meet or fails to meet the POLR service requirements in applicable laws and Commission rules, the LSP must provide POLR service to any ESI IDs currently receiving the service from the LSP affiliate and to ESI IDs in a future mass transition or upon customer request.(9) An LSP may elect to reassume provisioning of POLR service from the LSP affiliate by filing a reversion notice with the commission and notifying ERCOT at least 30 days in advance.(l) Mass transition of customers to POLR providers. The transfer of customers to POLR providers must be consistent with this subsection. (1) ERCOT must first transfer customers to VREPs, up to the number of ESI IDs that each VREP has offered to serve for each customer class in the POLR area. ERCOT must use the VREP list to assign ESI IDs to the VREPs in a non-discriminatory manner, before assigning customers to the LSPs. A VREP must not be assigned more ESI IDs than it has indicated it is willing to serve pursuant to subsection (i) of this section. To ensure non-discriminatory assignment of ESI IDs to the VREPs, ERCOT must: (A) Sort ESI IDs by POLR area;(B) Sort ESI IDs by customer class;(C) Sort ESI IDs numerically;(D) Sort VREPs numerically by randomly generated number; and(E) Assign ESI IDs in numerical order to VREPs, in the order determined in subparagraph (D) of this paragraph, in accordance with the number of ESI IDs each VREP indicated a willingness to serve pursuant to subsection (i) of this section. If the number of ESI IDs is less than the total that the VREPs indicated that they are willing to serve, each VREP must be assigned an equal number of ESI IDs, up to the number that each VREP indicated it was willing to serve for a given class and POLR area.(2) If the number of ESI IDs exceeds the amount the VREPs are designated to serve, ERCOT must assign remaining ESI IDs to LSPs in a non-discriminatory fashion, in accordance with their percentage of market share based upon retail sales in megawatt-hours, on a random basis within a class and POLR area, except that a VREP that is also an LSP that volunteers to serve at least 1% of its market share for a class of customers in a POLR area must be exempt from the LSP allocation up to 1% of the class and POLR area. To ensure non-discriminatory assignment of ESI IDs to the LSPs, ERCOT must: (A) Sort the ESI IDs in excess of the allocation to VREPs, by POLR area;(B) Sort ESI IDs in excess of the allocation to VREPs, by customer class;(C) Sort ESI IDs in excess of the allocation to VREPs, numerically;(D) Sort LSPs, except LSPs that volunteered to serve 1% of their market share as a VREP, numerically by MWhs served;(E) Assign ESI IDs that represent no more than 1% of the total market for that POLR area and customer class less the ESI IDs assigned to VREPs that volunteered to serve at least 1% of their market share for each POLR area and customer class in numerical order to LSPs designated in subparagraph (D) of this paragraph, in proportion to the percentage of MWhs served by each LSP to the total MWhs served by all LSPs;(F) Sort LSPs, including any LSPs previously excluded under subparagraph (D) of this paragraph; and(G) Assign all remaining ESI IDs in numerical order to LSPs in proportion to the percentage of MWhs served by each LSP to the total MWhs served by all LSPs.(3) Each mass transition must be treated as a separate event.(m) Rates applicable to POLR service. (1) A VREP must provide service to customers using a market-based, month-to-month product. The VREP must use the same market-based, month-to-month product for all customers in a mass transition that are in the same class and POLR area.(2) Subparagraphs (A) - (C) of this paragraph establish the maximum rate for POLR service charged by an LSP. An LSP may charge a rate less than the maximum rate if it charges the lower rate to all customers in a mass transition that are in the same class and POLR area. (A) Residential customers. The LSP rate for the residential customer class must be determined by the following formula: LSP rate (in $ per kWh) = (Non-bypassable charges + LSP customer charge + LSP energy charge) / kWh used, where:(i) Non-bypassable charges must be all TDU charges and credits for the appropriate customer class in the applicable service territory and other charges including ERCOT administrative charges, nodal fees or surcharges, reliability unit commitment (RUC) capacity short charges attributable to LSP load, and applicable taxes from various taxing or regulatory authorities, multiplied by the level of kWh and kW used, where appropriate.(ii) LSP customer charge must be $0.09 per kWh.(iii) Beginning on the 10th of each month, an LSP energy charge must be the average of the actual Real-Time Settlement Point Prices (RTSPPs) for the applicable load zone for the preceding calendar month (the historical average RTSPP) multiplied by the number of kWhs the customer used during that billing period and further multiplied by 120%. The LSP energy charge must not exceed 160%of the preceding calendar month's LSP energy charge. The applicable load zone will be the load zone located partially or wholly in the customer's TDU service territory with the highest average under the historical average RTSPP calculation.(iv) "Number of kWhs the customer used" is based on usage data provided to the POLR by the TDU.(B) Small and medium non-residential customers. The LSP rate for the small and medium non-residential customer classes must be determined by the following formula: LSP rate (in $ per kWh) = (Non-bypassable charges + LSP customer charge + LSP energy charge) / kWh used, where:(i) Non-bypassable charges must be all TDU charges and credits for the appropriate customer class in the applicable service territory, and other charges including ERCOT administrative charges, nodal fees or surcharges, RUC capacity short charges attributable to LSP load, and applicable taxes from various taxing or regulatory authorities, multiplied by the level of kWh and kW used, where appropriate.(ii) LSP customer charge must be $0.09 per kWh.(iii) Beginning on the 10th of each month, LSP energy charge must be the average of the actual RTSPPs for the applicable load zone for the preceding calendar month multiplied by the number of kWhs the customer used during that billing period and further multiplied by 125%. The LSP energy charge must not exceed 160% of the preceding calendar month's LSP energy charge. The applicable load zone will be the load zone located partially or wholly in the customer's TDU service territory with the highest average under the historical average RTSPP calculation.(iv) "Number of kWhs the customer used" is based on usage data provided to the POLR by the TDU.(C) Large non-residential customers. The LSP rate for the large non-residential customer class must be determined by the following formula: LSP rate (in $ per kWh) = (Non-bypassable charges + LSP customer charge + LSP demand charge + LSP energy charge) / kWh used, where: (i) Non-bypassable charges must be all TDU charges and credits for the appropriate customer class in the applicable service territory, and other charges including ERCOT administrative charges, nodal fees or surcharges, RUC capacity short charges attributable to LSP load, and applicable taxes from various taxing or regulatory authorities, multiplied by the level of kWh and KW used, where appropriate.(ii) LSP customer charge must be $2,897.00 per month.(iii) LSP demand charge must be $6.00 per kW, per month.(iv) LSP energy charge must be the appropriate RTSPP, determined on the basis of 15-minute intervals, for the customer multiplied by 125%, multiplied by the level of kilowatt-hours used. The energy charge must have a floor of $7.25 per MWh.(3) If in response to a complaint or upon its own investigation, the commission determines that an LSP failed to charge the appropriate rate prescribed by paragraph (2) of this subsection, and as a result overcharged its customers, the LSP must issue refunds to the specific customers who were overcharged.(4) On a showing of good cause by an affected person, the commission may direct an LSP to adjust the rate prescribed by paragraph (2) of this subsection, if necessary to ensure that the rate is consistent with prevailing market conditions. Notwithstanding any other commission rule to the contrary, such rates may be adjusted on an interim basis for good cause shown and after at least 10 business days' notice and an opportunity for hearing on the request for interim relief. Any adjusted rate must be applicable to all LSPs charging the rate prescribed by paragraph (2) of this subsection to the specific customer class, within the POLR area that is subject to the adjustment.(5) For transitioned customers, the customer and demand charges associated with the rate prescribed by paragraph (3) of this subsection must be pro-rated for partial month usage if a large non-residential customer switches from the LSP to a REP of choice.(n) Challenges to customer assignments. A POLR provider is not obligated to serve a customer within a customer class or a POLR area for which the REP is not designated as a POLR provider, after a successful challenge of the customer assignment. A POLR provider must use the ERCOT market variance resolution tool to challenge a customer class assignment with the TDU. The TDU must make the final determination based upon historical usage data and not premise type. If the customer class assignment is changed and a different POLR provider for the customer is determined appropriate, the customer must then be served by the appropriate POLR provider. Back dated transactions may be used to correct the POLR assignment.(o) Limitation on liability. A POLR provider must make reasonable provisions to provide service under this section to any ESI IDs currently receiving the service and to ESI IDs obtained in a future mass transition or served upon customer request; however, liabilities not excused by reason of force majeure or otherwise must be limited to direct, actual damages.(1) Neither the customer nor the POLR provider must be liable to the other for consequential, incidental, punitive, exemplary, or indirect damages. These limitations apply without regard to the cause of any liability or damage.(2) In no event will ERCOT or a POLR provider be liable for damages to any REP, whether under tort, contract or any other theory of legal liability, for transitioning or attempting to transition a customer from such REP to the POLR provider to carry out this section, or for marketing, offering or providing competitive retail electric service to a customer taking service under this section from the POLR provider.(p) REP obligations in a transition of customers to POLR service. (1) A customer may initiate service with an LSP by requesting such service at the rate prescribed by subsection (m)(2) of this section with any LSP that is designated to serve the requesting customer's customer class within the requesting customer's service area. An LSP cannot refuse a customer's request to make arrangements for POLR service, except as otherwise permitted under this title.(2) The POLR provider is responsible for obtaining resources and services needed to serve a customer once it has been notified that it is serving that customer. The customer is responsible for charges for service under this section at the rate in effect at that time.(3) If a REP terminates service to a customer, or transitions a customer to a POLR provider, the REP is financially responsible for the resources and services used to serve the customer until it notifies the independent organization of the termination or transition of the service and the transfer to the POLR provider is complete.(4) The POLR provider is financially responsible for all costs of providing electricity to customers from the time the transfer or initiation of service is complete until such time as the customer ceases taking service under this section.(5) A defaulting REP whose customers are subject to a mass transition event must return the customers' deposits within seven calendar days of the initiation of the transition.(6) ERCOT must create a single standard file format and a standard set of customer billing contact data elements that, in the event of a mass transition, must be used by the exiting REP and the POLRs to send and receive customer billing contact information. The process, as developed by ERCOT must be tested on a periodic basis. Each REP must submit timely, accurate, and complete files, as required by ERCOT in a mass transition event, as well as for periodic testing. The commission will establish a procedure for the verification of customer information submitted by REPs to ERCOT. ERCOT must notify the commission if any REP fails to comply with the reporting requirements in this subsection.(7) When customers are to be transitioned or assigned to a POLR provider, the POLR provider may request usage and demand data, and customer contact information including email, telephone number, and address from the appropriate TDU and from ERCOT, once the transition to the POLR provider has been initiated. Customer proprietary information provided to a POLR provider in accordance with this section must be treated as confidential and must only be used for mass transition related purposes.(8) Information from the TDU and ERCOT to the POLR providers must be provided in Texas SET format when Texas SET transactions are available. However, the TDU or ERCOT may supplement the information to the POLR providers in other formats to expedite the transition. The transfer of information in accordance with this section must not constitute a violation of the customer protection rules that address confidentiality.(9) A POLR provider may require a deposit from a customer that has been transitioned to the POLR provider to continue to serve the customer. Despite the lack of a deposit, the POLR provider is obligated to serve the customer transitioned or assigned to it, beginning on the service initiation date of the transition or assignment, and continuing until such time as any disconnection request is effectuated by the TDU. A POLR provider may make the request for deposit before it begins serving the customer, but the POLR provider must begin providing service to the customer even if the service initiation date is before it receives the deposit - if any deposit is required. A POLR provider must not disconnect the customer until the appropriate time period to submit the deposit has elapsed. For the large non-residential customer class, a POLR provider may require a deposit to be provided in three calendar days. For the residential customer class, the POLR provider may require a deposit to be provided after 15 calendar days of service if the customer received 10 days' notice that a deposit was required. For all other customer classes, the POLR provider may require a deposit to be provided in 10 calendar days. The POLR provider may waive the deposit requirement at the customer's request if deposits are waived in a non-discriminatory fashion. If the POLR provider obtains sufficient data, it must determine whether a residential customer has satisfactory credit based on the criteria the POLR provider routinely applies to its other residential customers. If the customer has satisfactory credit, the POLR provider must not request a deposit from the residential customer.(A) At the time of a mass transition, the executive director or staff designated by the executive director will distribute available proceeds from an irrevocable stand-by letter of credit in accordance with the priorities established in § 25.107(f)(6) of this title. For a REP that has obtained a current list from the Low Income List Administrator (LILA) that identifies low-income customers, these funds must first be used to provide deposit payment assistance for that REP's transitioned low-income customers. The Executive Director or staff designee will, at the time of a transition event, determine the reasonable deposit amount up to $400 per customer ESI ID, unless good cause exists to increase the level of the reasonable deposit amount above $400. Such reasonable deposit amount may take into account factors such as typical residential usage and current retail residential prices, and, if fully funded, must satisfy in full the customers' initial deposit obligation to the VREP or LSP.(B) For a REP that has obtained a current list from the LILA that identifies low-income customers, the Executive Director or the staff designee will distribute available proceeds pursuant to § 25.107(f)(6) of this title to the VREPs proportionate to the number of customers they received in the mass transition, who at the time of the mass transition were identified as low-income customers by the current LILA list, up to the reasonable deposit amount set by the Executive Director or staff designee. If funds remain available after distribution to the VREPs, the remaining funds must be distributed to the appropriate LSPs by dividing the amount remaining by the number of low income customers as identified in the LILA list that are allocated to LSPs, up to the reasonable deposit amount set by the Executive Director or staff designee.(C) If the funds distributed in accordance with § 25.107(f)(6) of this title do not equal the reasonable deposit amount determined, the VREP and LSP may request from the customer payment of the difference between the reasonable deposit amount and the amount distributed. Such difference must be collected in accordance with § 25.478(e)(3) of this title (relating to Credit Requirements and Deposits).(D) Notwithstanding § 25.478(d) of this title, 90 days after the transition date, the VREP or LSP may request payment of an amount that results in the total deposit held being equal to what the VREP or LSP would otherwise have charged a customer in the same customer class and service area in accordance with § 25.478(e) of this title, at the time of the transition.(10) On the occurrence of one or more of the following events, ERCOT must initiate a mass transition to POLR providers, of all of the customers served by a REP:(A) Termination of the Load Serving Entity (LSE) or Qualified Scheduling Entity (QSE) Agreement for a REP with ERCOT;(B) Issuance of a commission order recognizing that a REP is in default under the TDU Tariff for Retail Delivery Service;(C) Issuance of a commission order de-certifying a REP;(D) Issuance of a commission order requiring a mass transition to POLR providers;(E) Issuance of a judicial order requiring a mass transition to POLR providers; and(F) At the request of a REP, for the mass transition of all of that REP's customers.(11) A REP must not use the mass transition process in this section as a means to cease providing service to some customers, while retaining other customers. A REP's improper use of the mass transition process may lead to de-certification of the REP.(12) ERCOT may provide procedures for the mass transition process, consistent with this section.(13) A mass transition under this section must not override or supersede a switch request made by a customer to switch an ESI ID to a new REP of choice, if the request was made before a mass transition is initiated. If a switch request has been made but is scheduled for any date after the next available switch date, the switch must be made on the next available switch date.(14) ERCOT must identify customers who are mass transitioned for a period of 60 calendar days. The identification must terminate at the first completed switch or at the end of the 60-day period, whichever is first. If necessary, ERCOT system changes or new transactions must be implemented no later than 14 months from the effective date of this section to communicate that a customer was acquired in a mass transition and is not charged the out-of-cycle meter read pursuant to paragraph (16) of this subsection.(15) In the event of a transition to a POLR provider or away from a POLR provider to a REP of choice, the switch notification notice detailed in § 25.474(l) of this title (relating to Selection of Retail Electric Provider) is not required.(16) In a mass transition event, the ERCOT initiated transactions must request an out-of-cycle meter read for the associated ESI IDs for a date two calendar days after the calendar date ERCOT initiates such transactions to the TDU. If an ESI ID does not have the capability to be read in a fashion other than a physical meter read, the out-of-cycle meter read may be estimated. An estimated meter read for the purpose of a mass transition to a POLR provider must not be considered a break in a series of consecutive months of estimates, but must not be considered a month in a series of consecutive estimates performed by the TDU. A TDU must create a regulatory asset for the TDU fees associated with a mass transition of customers to a POLR provider pursuant to this subsection. Upon review of reasonableness and necessity, a reasonable level of amortization of such regulatory asset must be included as a recoverable cost in the TDU's rates in its next rate case or such other rate recovery proceeding as deemed necessary. The TDU must not bill as a discretionary charge, the costs included in this regulatory asset, which must consist of the following: (A) fees for out-of-cycle meter reads associated with the mass transition of customers to a POLR provider; and(B) fees for the first out-of-cycle meter read provided to a customer who transfers away from a POLR provider, when the out-of-cycle meter read is performed within 60 calendar days of the date of the mass transition and the customer is identified as a transitioned customer.(17) In the event the TDU estimates a meter read for the purpose of a mass transition, the TDU must perform a true-up evaluation of each ESI ID after an actual meter reading is obtained. Within 10 days after the actual meter reading is obtained, the TDU must calculate the actual average kWh usage per day for the time period from the most previous actual meter reading occurring prior to the estimate for the purpose of a mass transition to the most current actual meter reading occurring after the estimate for the purpose of mass transition. If the average daily estimated usage sent to the exiting REP is more than 50% greater than or less than the average actual kWh usage per day, the TDU must promptly cancel and re-bill both the exiting REP and the POLR using the average actually daily usage.(q) Termination of POLR service provider status.(1) The commission may revoke a REP's POLR status after notice and opportunity for hearing: (A) If the POLR provider fails to maintain REP certification;(B) If the POLR provider fails to provide service in a manner consistent with this section;(C) The POLR provider fails to maintain appropriate financial qualifications; or(D) For other good cause.(2) If an LSP defaults or has its status revoked before the end of its term, after a review of the eligibility criteria, the commission staff designee will, as soon as practicable, designate the next eligible REP, if any, as an LSP, based on the criteria in subsection (j) of this section.(3) At the end of the POLR service term, the outgoing LSP must continue to serve customers who have not selected another REP.(r) Electric cooperative delegation of authority. An electric cooperative that has adopted customer choice may select to delegate to the commission its authority to select POLR providers under PURA §41.053(c) in its certificated service area in accordance with this section. After notice and opportunity for comment, the commission will, at its option, accept or reject such delegation of authority. If the commission accepts the delegation of authority, the following conditions apply: (1) The board of directors must provide the commission with a copy of a board resolution authorizing such delegation of authority;(2) The delegation of authority must be made at least 30 calendar days prior to the time the commission issues a publication of notice of eligibility;(3) The delegation of authority must be for a minimum period corresponding to the period for which the solicitation must be made;(4) The electric cooperative wishing to delegate its authority to designate a continuous provider must also provide the commission with the authority to apply the selection criteria and procedures described in this section in selecting the POLR providers within the electric cooperative's certificated service area; and(5) If there are no competitive REPs offering service in the electric cooperative certificated area, the commission must automatically reject the delegation of authority.(s) Reporting requirements. Each LSP that serves customers under a rate prescribed by subsection (m)(2) of this section must file the following information with the commission on a quarterly basis beginning January of each year in a project established by the commission for the receipt of such information. Each quarterly report must be filed within 30 calendar days of the end of the quarter.(1) For each month of the reporting quarter, each LSP must report the total number of new customers acquired by the LSP under this section and the following information regarding these customers:(A) The number of customers from whom a deposit was requested pursuant to the provisions of § 25.478 of this title, and the average amount of deposit requested;(B) The number of customers from whom a deposit was received, including those who entered into deferred payment plans for the deposit, and the average amount of the deposit;(C) The number of customers whose service was physically disconnected pursuant to the provisions of § 25.483 of this title (relating to Disconnection of Service) for failure to pay a required deposit; and(D) Any explanatory data or narrative necessary to account for customers that were not included in either subparagraph (B) or (C) of this paragraph.(2) For each month of the reporting quarter each LSP must report the total number of customers to whom a disconnection notice was issued pursuant to the provisions of § 25.483 of this title and the following information regarding those customers: (A) The number of customers who entered into a deferred payment plan, as defined by § 25.480(j) of this title (relating to Bill Payment and Adjustments) with the LSP;(B) The number of customers whose service was physically disconnected pursuant to § 25.483 of this title;(C) The average amount owed to the LSP by each disconnected customer at the time of disconnection; and(D) Any explanatory data or narrative necessary to account for customers that are not included in either subparagraph (A) or (B) of this paragraph.(3) For the entirety of the reporting quarter, each LSP must report, for each customer that received POLR service, the TDU and customer class associated with the customer's ESI ID, the number of days the customer received POLR service, and whether the customer is currently the LSP's customer.(t) Notice of transition to POLR service to customers. When a customer is moved to POLR service, the customer must be provided notice of the transition by ERCOT, the REP transitioning the customer, and the POLR provider. The ERCOT notice must be provided within two days of the time ERCOT and the transitioning REP know that the customer must be transitioned and customer contact information is available. If ERCOT cannot provide notice to customers within two days, it must provide notice as soon as practicable. The POLR provider must provide the notice required by paragraph (3) of this subsection to commission staff at least 48 hours before it is provided to customers, and must provide the notice to transitioning customers as soon as practicable. The POLR provider must email the notice to the commission staff members designated for receipt of the notice. (1) ERCOT notice methods must include a post-card, containing the official commission seal with language and format approved by the commission. ERCOT must notify transitioned customers with an automated phone-call and email to the extent the information to contact the customer is available pursuant to subsection (p)(6) of this section. ERCOT must study the effectiveness of the notice methods used and report the results to the commission.(2) Notice by the REP from which the customer is transferred must include: (A) The reason for the transition;(B) A contact number for the REP;(C) A statement that the customer will receive a separate notice from the POLR provider that must disclose the date the POLR provider must begin serving the customer;(D) Either the customer's deposit plus accrued interest, or a statement that the deposit must be returned within seven days of the transition;(E) A statement that the customer can leave the assigned service by choosing a competitive product or service offered by the POLR provider, or another competitive REP, as well as the following statement: "If you would like to see offers from different retail electric providers, please access www.powertochoose.org, or call toll-free 1-866-PWR-4-TEX (1-866-797-4839) for a list of providers in your area;"(F) For residential customers, notice from the commission in the form of a bill insert or a bill message with the header "An Important Message from the Public Utility Commission Regarding Your Electric Service" addressing why the customer has been transitioned to another REP, the continuity of service purpose, the option to choose a different competitive provider, and information on competitive markets to be found at www.powertochoose.org, or toll-free at 1-866-PWR-4-TEX (1-866-797-4839);(G) If applicable, a description of the activities that the REP will use to collect any outstanding payments, including the use of consumer reporting agencies, debt collection agencies, small claims court, and other remedies allowed by law, if the customer does not pay or make acceptable payment arrangements with the REP; and(H) Notice to the customer that after being transitioned to POLR service, the customer may accelerate a switch to another REP by requesting a special or out-of-cycle meter read.(3) Notice by the POLR provider must include: (A) The date the POLR provider began or will begin serving the customer and a contact number for the POLR provider;(B) A description of the POLR provider's rate for service. In the case of a notice from an LSP that applies the pricing of subsection (m)(2) of this section, a statement that the price is generally higher than available competitive prices;(C) The deposit requirements of the POLR provider and any applicable deposit waiver provisions and a statement that, if the customer chooses a different competitive product or service offered by the POLR provider, a REP affiliated with the POLR provider, or another competitive REP, a deposit may be required;(D) A statement that the additional competitive products or services may be available through the POLR provider, a REP affiliated with the POLR provider, or another competitive REP, as well as the following statement: "If you would like to choose a different retail electric provider, please access www.powertochoose.org, or call toll-free 1-866-PWR-4-TEX (1-866-797-4839) for a list of providers in your area;"(E) The applicable Terms of Service and Electricity Facts Label (EFL); and(F) For residential customers that are served by an LSP under a rate prescribed by subsection (m)(2) of this section, a notice to the customer that after being transitioned to service from a POLR provider, the customer may accelerate a switch to another REP by requesting a special or out-of-cycle meter read.(u) Market notice of transition to POLR service. ERCOT must notify all affected Market Participants and the Retail Market Subcommittee (RMS) email listserv of a mass transition event within the same day of an initial mass-transition call after the call has taken place. The notification must include the exiting REP's name, total number of ESI IDs, and estimated load.(v) Disconnection by a POLR provider. The POLR provider must comply with the applicable customer protection rules as provided for under Subchapter R of this chapter, except as otherwise stated in this section. To ensure continuity of service, service under this section must begin when the customer's transition to the POLR provider is complete. A customer deposit is not a prerequisite for the initiation of service under this section. Once service has been initiated, a customer deposit may be required to prevent disconnection. Disconnection for failure to pay a deposit may not occur until after the proper notice and after that appropriate payment period detailed in § 25.478 of this title has elapsed, except where otherwise noted in this section.(w) Deposit payment assistance. (1) The commission staff designee will distribute the deposit payment assistance monies to the appropriate POLRs on behalf of customers as soon as practicable.(2) The executive director or staff designee will use best efforts to provide written notice to the appropriate POLRs of the following on or before the second calendar day after the transition: (A) a list of the ESI IDs identified by the LILA that have been or will be transitioned to the applicable POLR (if available); and(B) the amount of deposit payment assistance that will be provided on behalf of a POLR customer identified by the LILA (if available).(3) Amounts credited as deposit payment assistance pursuant to this section must be refunded to the customer in accordance with § 25.478(j) of this title.16 Tex. Admin. Code § 25.43
The provisions of this §25.43 adopted to be effective September 12, 2002, 27 TexReg 8428; amended to be effective July 31, 2006, 31 TexReg 5910; amended to be effective June 4, 2009, 34 TexReg 3361; amended to be effective March 8, 2010, 35 TexReg 1980; amended to be effective August 19, 2012, 37 TexReg 6006; amended to be effective February 12, 2014, 39 TexReg 627; amended to be effective February 12, 2014, 39 TexReg 627; Amended by Texas Register, Volume 43, Number 19, May 11, 2018, TexReg 3020, eff. 5/13/2018; Amended by Texas Register, Volume 46, Number 53, December 31, 2021, TexReg 9259, eff. 1/6/2022; Amended by Texas Register, Volume 47, Number 46, November 18, 2022, TexReg 7669, eff. 11/23/2022