16 Tex. Admin. Code § 3.18

Current through Reg. 49, No. 49; December 6, 2024
Section 3.18 - Mud Circulation Required

When coming out of the hole with the drill pipe, drilling fluid shall be circulated until equalized, and a fill-up line shall be turned into the casing to insure a full load of fluid on the bottom of the hole at all times.

16 Tex. Admin. Code § 3.18

The provisions of this §3.18 adopted to be effective January 1, 1976.