S.C. Code Regs. § § 61-92.280.C.36

Current through Register Vol. 48, No. 10, October 25, 2024
Section 61-92.280.C.36 - PERIODIC OPERATION AND MAINTENANCE WALKTHROUGH INSPECTIONS
(a) To properly operate and maintain UST systems, not later than May 26, 2020 owners and operators must meet one of the following:
(1) Conduct a walkthrough inspection that, at a minimum, checks the following equipment as specified below:
(i) Every 30 days:
(A) Spill prevention equipment- visually check for damage; remove liquid or debris; check for and remove obstructions in the fill pipe; check the fill cap to make sure it is securely on the fill pipe; and, for double walled spill prevention equipment with interstitial monitoring, check for a leak in the interstitial area; and
(B) Release detection equipment- check to make sure the release detection equipment is operating with no alarms or other unusual operating conditions present; and ensure records of release detection testing are reviewed and current; and
(ii) Annually:
(A) Containment sumps-visually check for damage, leaks to the containment area, or releases to the environment; remove liquid (in contained sumps) or debris; and, for double walled sumps with interstitial monitoring, check for a leak in the interstitial area; and
(B) Hand held release detection equipment-check devices such as tank gauge sticks or groundwater bailers for operability and serviceability;
(2) Conduct operation and maintenance walkthrough inspections according to a standard code of practice developed by a nationally recognized association or independent testing laboratory that checks equipment comparable to paragraph (a)(1) of this section; or

[Note to paragraph (a)(2). The following code of practice may be used to comply with paragraph (a)(2) of this section: Petroleum Equipment Institute Recommended Practice RP 900, ''Recommended Practices for the Inspection and Maintenance of UST Systems."]

(3) Conduct operation and maintenance walkthrough inspections developed by the Department that checks equipment comparable to paragraph (a)(1) of this section.
(b) Owners and operators must maintain records (in accordance with Section 280.34) of operation and maintenance walkthrough inspections for one year. Records must include a list of each area checked, whether each area checked was acceptable or needed action taken, and a description of actions taken to correct an issue. All operation and maintenance walkthrough records must be documented using a Department form, a Department approved form, or submitted in a format as approved by the Department.

S.C. Code Regs. § 61-92.280.C.36

Added by State Register Volume 41, Issue No. 05, eff. 5/26/2017.