Before a SOFT DRINK, BOTTLED WATER, or ICE plant is constructed or extensively REMODELED, or when an existing structure is converted for use as a SOFT DRINK, BOTTLED WATER, or ICE plant, the BOTTLED WATER, SOFT DRINK, or ICE manufacturer must submit properly prepared plans and specifications for such construction, remodeling, or conversion to the DEPARTMENT for review and approval before construction, remodeling, or conversion. The plans and specifications shall indicate the proposed layout, arrangement, mechanical plans, and construction materials of work areas, and the make and model number of proposed fixed EQUIPMENT and facilities.
S.C. Code Regs. § 61-32.X