Current through Register Vol. 48, No. 10, October 25, 2024
Section 61-107.3.V.B - Closure ProceduresWaste tire collection and processing facilities shall close in accordance with the following procedures:
1. At least sixty (60) days prior to closure, written notice of intent to close and a proposed closure date shall be submitted to the Department;2. Upon closing, immediately post closure signs at the facility;3. All waste tires, processed tires, residuals, and any other waste at a facility shall be removed to a permitted processing or disposal facility and the waste handling areas shall be cleaned within ten (10) days of closure;4. Within ten (10) days of closure, a Department inspection and approval of closure shall be requested; and,5. Within sixty (60) days of closure, grade land to promote positive drainage and seed with native vegetation to prevent erosion.S.C. Code Regs. § 61-107.3.V.B
Replaced and amended by State Register Volume 39, Issue No. 06, eff. 6/26/2015.