Chapter 121 - DEPARTMENT OF NATURAL RESOURCES
- Section 121-8.0 - Purpose
- Section 121-8.1 - Applicability
- Section 121-8.2 - Definitions
- Section 121-8.3 - General
- Section 121-8.4 - Exploration Permits
- Section 121-8.5 - Well Drilling Permits
- Section 121-8.6 - Performance Bond
- Section 121-8.7 - Permit Actions
- Section 121-8.8 - Change of Operator
- Section 121-8.9 - Spacing of Wells
- Section 121-8.10 - Identification of Wells
- Section 121-8.11 - Notice of Operations
- Section 121-8.12 - Casing and Cementing
- Section 121-8.13 - Plugging
- Section 121-8.14 - Reports, Logs and Samples
- Section 121-8.15 - Blow-out Prevention
- Section 121-8.16 - Drilling Fluid
- Section 121-8.17 - Directional Drilling
- Section 121-8.18 - Chemical Treatment and Fracturing
- Section 121-8.19 - Production Operations
- Section 121-8.20 - Pool Classification and Determination of Allowables
- Section 121-8.21 - Transportation
- Section 121-8.22 - Underground Injection for Enhanced Recovery, Saltwater and Oil-Field Wastes, and Hydrocarbon Storage
- Section 121-8.23 - Water Wells
- Section 121-8.26 - Environmental Protection and Safety
- Section 121-8.27 - Hearings
- Section 121-8.28 - Enforcement
- DROUGHT PLANNING RESPONSE (§§ 121-11.1 — 121-11.12)