Current through November 7, 2024
Section 250-RICR-120-05-32.10 - Compliance SchedulesA. Any marine terminal at which a loading event subject to this regulation is conducted shall be in compliance with the provisions of §§ 32.7 and 32.8 of this Part on and after January 1, 1996.B. The owner or operator of any marine terminal at which loading events subject to this regulation are conducted shall, by July 30, 1994, submit to the Director a compliance plan which describes the steps and schedule that will be taken to achieve compliance with this regulation.C. Any compliance plan which includes equipment replacement or modification or installation of emission control equipment shall provide for periodic increments of progress, including but not limited to: 1. Date by which engineering plans and permit applications will be submitted,2. Date by which equipment will be ordered,3. Installation date after confirmation of order by the manufacturer, and,4. Date by which the applicable regulatory emission limitations will be achieved after equipment is in satisfactory operation.D. No compliance schedule submitted to satisfy the requirements of this section shall allow a facility to exceed any applicable emission limitations including but not limited to: 1. Best Available Control Technology determinations, or,2. Lowest Achievable Emissions Rate determinations, or,3. Federal New Source Performance Standards codified at 40 C.F.R. § 60, or National Emission Standards for Hazardous Air Pollutants, codified at 40 C.F.R. § 61or §63, or,4. Any other condition or standard that is specifically required by the Clean Air Act (as amended) for new or modified sources.E. Compliance schedules submitted in accordance with the requirements of this section are subject to review and approval by the Director.250 R.I. Code R. 250-RICR-120-05-32.10