52 Pa. Code § 69.2103

Current through Register Vol. 54, No. 50, December 14, 2024
Section 69.2103 - Definitions

The following words and terms, when used in this section and § § 69.2101, 69.2102 and 69.2104 (relating to interconnection application fees), have the following meanings, unless the context clearly indicates otherwise:

Area network impact study-An engineering study conducted by an Electric Distribution Company of a local area network under § 75.40 (relating to Level 4 interconnection review).

Customer-generator-A nonutility owner or operator of a net metered distributed generation system as defined in § 75.1 (relating to definitions).

Facility study-A study conducted by an electric distribution company or a third party consultant for the customer-generator as defined in § 75.22 (relating to definitions).

Feasibility study-A preliminary evaluation of the system impact and cost of interconnecting the small generator facility to the electric distribution company's electric distribution system, as defined in § 75.22.

Level 1 review-The interconnection application review level in § 75.37 (relating to Level 1 interconnection review).

Level 2 review-The interconnection application review level in § 75.38 (relating to Level 2 interconnection review).

Level 3 review-The interconnection application review level in § 75.39 (relating to Level 3 interconnection review).

Level 4 review-The interconnection application review level in § 75.40 (relating to Level 4 interconnection review).

System impact study-An engineering study that evaluates the impact of the proposed interconnection on the safety and reliability of an electric distribution company's electric distribution system, as defined in § 75.22.

52 Pa. Code § 69.2103

The provisions of this § 69.2103 adopted April 3, 2009, effective 4/4/2009, 39 Pa.B. 1676.

This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); and 52 Pa. Code § 69.2102 (relating to statement of purpose).