This subchapter requires jurisdictional electric utilities with existing coal-fired generating units to uprate their electric power production by increasing the capability to use coal where economically feasible and where the uprate is beneficial to ratepayers. This subchapter also establishes an optional rate rider and preferential base rate recognition mechanisms for special cost recovery for upgradings. This subchapter is required by 66 Pa.C.S. § 514 (relating to use of coal).
52 Pa. Code § 57.121
The provisions of this § 57.121 amended under Public Utility Code, the Public Utility Code, 66 Pa.C.S. § § 308, 331, 501, 504 and 1501.