Current through Register Vol. 54, No. 45, November 9, 2024
Section 275.205 - Erosion control(a) The operator shall manage surface water and control erosion and sedimentation to meet the applicable requirements of Chapter 102 (relating to erosion and sediment control).(b) For land reclamation, rills and gullies shall be filled, graded or otherwise stabilized and the area reseeded or replanted when rills or gullies deeper than 9 inches form in areas where sewage sludge has been applied or stored.(c) For agricultural utilization and land disposal, rills and gullies shall be filled, graded or otherwise stabilized and, when necessary, the area reseeded or replanted, when rills or gullies deeper than 3 inches form in areas where sewage sludge has been applied or stored.(d) The Department will require that rills or gullies of lesser size be stabilized and the area reseeded or replanted if the rills or gullies may result in additional erosion, sedimentation or pollution.